158
Setting Routing Tables
Section 7-4
7-4
Setting Routing Tables
This section describes routing table settings.
Routing tables are set through the CX-Net (in CX-Programmer), SYSMAC
LINK, or Controller Link Support Software. This section describes setting pro-
cedures and setting details.
See the operating manual of the Programming Device you are using for the
specific setting procedure.
Note
1.
Routing tables cannot be set through Programming Consoles.
2.
Networks cannot be crossed by a Programming Device without setting
routing tables. Routing tables can therefore be set only for nodes connect-
ed to the Programming Device and other nodes in the same network. Dis-
connect and reconnect the Programming Device to each network when
setting routing tables in multiple networks.
3.
Make sure that the routing tables are properly set at all nodes on the net-
work. If a message is sent to a node without correct routing tables, trans-
mission will not work properly and a response may not be returned.
4.
When using a CVM1 or CV-series CPU Unit manufactured prior to April
1996, be sure to register routing tables whether or not the PLC is connect-
ing multiple networks. The date of production can be checked on the lot
number as explained below. (The lot number is a four-digit number written
on the side panel of the CPU Unit.)
7-4-1
Routing Table Setting Procedure
The procedure for setting routing tables is described below.
1,2,3...
1.
Edit the local network table.
2.
Edit the relay network table.
3.
Save the routing tables.
4.
Connect the Programming Device to a PLC.
5.
Transfer the routing tables.
Lot No.:
@
@
4 6 Manufactured in April 1996
Indicates the last digit of the manufacturing
year. In this example, the year is 1996.
Indicates the month of manufacture. October,
November, and December are indicated by x, y,
and z respectively. In this example, the month is
April.
Note
Routing tables are required if any of the CVM1 or CV-series CPU Units in
the network have been manufactured on or before April 1996.
Repeat the editing and
saving steps for all
nodes set with the rout
ing tables.
Summary of Contents for CS1W-CLK12-V1
Page 3: ...iv ...
Page 5: ...vi ...
Page 9: ...x TABLE OF CONTENTS ...
Page 11: ...xii ...
Page 59: ...42 Component Names and Functions Section 3 1 Dimensions Unit mm ...
Page 62: ...45 Component Names and Functions Section 3 1 Dimensions Unit mm ...
Page 91: ...74 CVM1 and CV series Optical Ring Controller Link Units Section 4 2 ...
Page 108: ...91 Setting Data Links Section 5 2 Device Information Setting Data Link Tables ...
Page 125: ...108 Checking Data Link Status Section 5 4 ...
Page 181: ...164 Setting Routing Tables Section 7 4 ...
Page 199: ...182 Memory Areas Related to Duplex Operation Section 8 6 ...
Page 275: ...258 Handling Precautions Section 10 7 ...
Page 298: ...281 CS series Optical Bus Controller Link Units Appendix C Dimensions Unit mm 101 35 130 ...
Page 299: ...282 CS series Optical Bus Controller Link Units Appendix C ...