7
.
Serial Communications Connection Procedure
35
5
Check that USB is set as the
network type in the Change PLC
Dialog Box. Click
OK
.
*If USB is not set as the network
type, select
USB
from the
pull-down list.
6
Select
Connect to PLC
from the
PLC Menu.
7
The PLC Icon in the Project
Workspace changes from Offline
to Program. It means that PLC is
connected online.
*If Monitor or Run is displayed,
change it to Program by
following step 8.
8
If the operating mode of PLC is
Monitor or Run in step 7, select
Operating Mode
-
Program
from the PLC Menu.
The confirmation dialog box on
the right is displayed.
Confirm that there is no
problem, and click
Yes
.
Check that the operating mode
changes to Program mode as
shown in step 7.
9
Double-click
New Protocol List
in the Project Workspace to
display a tree.
Summary of Contents for CJ2H-CPU64 -
Page 81: ...78...
Page 82: ...2016 0616 P652 E1 01...