13
(3) For EIA standard-compliant installation, use the 8 included EIA rack fixing nuts (M5) and 8 EIA/
JIS rack fixing screws (M5) to securely fasten the front (the side displaying “L” or “R”) and the back
of the support angles to the server rack.
3
The screw holes are located at the top and bottom for
both front and rear.
For JIS standards, use a total of 6 included screws to fix the rack; 1 JIS rack fixing flat-head screw
(M5) at a front position of the each of right and left support angles, 2 EIA/JIS rack fixing screws (M5)
at 2 rear positions.
3
The screw hole position for the front is at the second screw hole from the top,
the rear is at the second screw hole from the bottom.
(4) Use the 8 included ear bracket mounting flat-head
screws (2 sets of 4 screws) to securely fasten
the ear brackets to the left and right sides of this unit.
4
(2) Adjust the length of support angles to suit the server rack, and then securely tighten the screws
that were half-tightened in step 1.
2
BATTER
Y UNIT
4
4
Rack fixing screws
Adjust the length to
suit the server rack
and tighten securely.
2
2
3
3
The support angles cannot be attached to special EIA/JIS racks.