iii
Procedure from installation to operation
Start
Installation/connection
Preparation for operation
Maintenance/
inspection
Yes
No
No
Yes
Read “Safety precautions”
Page v
Remove the product from the
package and check the contents
Page 1
Perform installation and
connection Page 5
Check the operation and
displays Pages 21
Charge the battery
Page 23
Measure the backup time
Page 34
Read “Using the UPS
monitoring software and
contact signal” Page 38
Operate Page 24
Deteriorated
battery?
Perform maintenance
and inspection Page 36
Replace the battery
Are you
using UPS monitoring
software or contact
signal?
Charge the battery again
Page 23
* Preparation for operation is
complete.
Summary of Contents for BU2002RWL
Page 60: ...10 48 Notes of Chinese 10 UPS UPS 1 FA OA Windows UPS...
Page 61: ...10 Notes of Chinese 49 2 FA OA 2...
Page 62: ...BU2002RWL BU3002RWL BU5002RWL 10 50 AC 50 60Hz AC AC AC AC...
Page 63: ...10 Notes of Chinese 51 5cm 10cm UPS UPS AC AC AC200V 240V AC200 240V...
Page 65: ...10 Notes of Chinese 53 AC UPS AC UPS...
Page 66: ...BU2002RWL BU3002RWL BU5002RWL 10 54 AC AC 50 60Hz 25 25 6 40 2 AC AC...
Page 67: ...10 Notes of Chinese 55 DC250V UPS 200V http www fa omron com cn Pb AC AC 50 60Hz...