00075263.DOC, Version 1.0
30/36
5. SET UP
Installation
Install the control unit and the player mechanism unit on a plane surface or in your rack. For 19" (483 mm)
rack installation, 2 units are required each. You can fix each unit with four screws M6 in the rack. The player
mechanism unit must be operated in a horizontal position. The control unit may be installed in a tilted
position for better handling. When choosing the installation spot make sure that there is enough space
around the units for ventilation or that heated air from the rack can be passed on to improve heat radiation.
Steady overheating will damage the units.
Connections
Prior to connecting or changing existing connections switch off the
XCP-2800MT.
1
Connect jack [Connect To Main Unit] of the control unit to the jack [Connect To Control Unit] of the
player mechanism unit with the supplied connection cable.
2
Connect subsequent units with line level inputs (e.g. amplifier or mixer) via the supplied RCA cables to
the RCA outputs on the rear. Make sure that the right/left occupation is the same at the devices.
3
Use the supplied power cable to connect the
XCP-2800MT
to the mains.