background image

Absolute Encoding Register Meters

The C3IWireless Standard Gateway can
read Sensus Absolute Digital Encoder type

g

yp

water and gas encoders.  Encoder meters
utilize a 3 wire connection to the
C3IWireless Gateway.  There are two
available input ports for the encoders.  The
terminals are labeled R, G, and B and they
are simply wired to the corresponding

are simply wired to the corresponding
terminals on the encoder meter head.

The register reading must be assigned to
one of the 4 input channels on the
C3IWireless Gateway.  The C3IConfig PDA
is used to make these assignments.

Since absolute encoders provide a direct
register reading to the C3IWireless
Gateway, no calibration is required.  We
recommend the use of these meters
whenever possible.

Note:  Not all digits are always
transmitted in the encoder protocol.
Depending on register programming the
appropriate multiplier must be used in
the software.

Summary of Contents for C3IWirelessGateway

Page 1: ...C3IWirelessGateway Installation Manual Omni Pro Software Inc 23608 458th Avenue Madison SD 57042 C3IWireless Gateway Installation Manual 605 270 2285...

Page 2: ...ys 3 Pilot Relays 2 Meter Encoder Inputs RS485 Serial Port Metering Inputs Integrated VHF Radio Transceiver Power Supply GE I210 C i ti M d l GE I210 Communication Modules Plug In Type 12 Volt Regulat...

Page 3: ...ROM MASTER TO DIGIPEATER ID 20 POLL MESSAGE FROM DIGIPEATER ID 20 TO UNIT ID 500 RESPONSE MESSAGE FROM UNIT ID 500 TO DIGIPEATER ID 20 RESPONSE MESSAGE FROM DIGIPEATER ID 20 TO MASTER COMPUTER RESPONS...

Page 4: ...he digipeater is communicating with the master try polling the unit with a different digipeater It is possible that the unit is too far away or has an obstruction reducing the signal strength etc The...

Page 5: ...ulators Meter Diagnostics and Voltage Remote Disconnect Status Where Available With GE I210 RD Meter Demand Poll C I Units Only 2 Input Counters 2 Input Counters 4 Status Inputs 3 Relay Status 3 Relay...

Page 6: ...N See Picture The condensation facing DOWN See Picture The condensation drain hole is located on the bottom of enclosure Screw Terminals are labeled for power pulse status inputs and relays 1 3 Power...

Page 7: ...arness Gateway should now be operational Verify operation of GREEN power status LED LED will blink continuously on the standard version of the GREEN power status LED LED will blink continuously on the...

Page 8: ...are simply wired to the corresponding terminals on the encoder meter head The register reading must be assigned to one of the 4 input channels on the C3IWireless Gateway The C3IConfig PDA is used to...

Page 9: ...s no guarantee that interference will not occur in a particular installation If this equipment does cause harmful interference to radio or television reception which can be determined by turning the e...

Reviews: