Attach Wiring Harness To Gateway
•
GATEWAY
GE I210+ Harness
•
12 VDC +
Red
•
12 VDC -
Black Wire
•
RS 485+
Blue or Green Wire
•
RS 485-
White Wire
•
Install GE Com Module Equipped Electric Meter
•
Attach quick connect harness. Gateway should now be operational. Verify operation of
GREEN power/status LED LED will blink continuously on the standard version of the
GREEN power/status LED. LED will blink continuously on the standard version of the
gateway when assigned meters are not reporting valid data to the C3IWireless Gateway.
•
Secure the enclosure with screws, plugs, and a utility seal when installation is finished