MANUAL CALIBRATION TEST WELDS 

 

When calibrating the RhinoBond Tool manually, it’s important to set -- and test -- the tool at several Energy Levels to determine which setting provides the best weld.  
 

To calibrate the tool, place at least five (5) plates on insulation about 10-inches (25 cm) apart, and cover the plates with a 

piece of membrane from the project. 
 

Calibration videos available on line at OMGRoofing.com.

Set the energy setting to the lowest setting that you think will provide a complete bond (e.g. level #0) and weld the 

first plate. 

 

Productivity Tip: 

Tracing the base of the tool with a grease pencil will help you judge your accuracy in centering the coil over the plate.  

 

 

At the end of the weld cycle, place a magnetic cooling clamp on the plate, and mark the energy setting on the 

membrane for reference.  

Adjust the “Energy Level” to the next higher setting, and repeat the test weld process until all five plates are 

welded with increasingly higher energy levels. 

Allow the plates to cool to the touch - at least 5 minutes - before removing the magnetic heat sinks.  

 

Use pliers to peel each plate off to review the quality of the welds. 

 

 

 

 

100% BOND

Look for total, even, and consistent 360° adhesion of membrane.  The welded plate should make a visible impression 

on the top of membrane, and the membrane should delaminate to the scrim in a fairly complete circle/donut.  

 

Look at the reference “Energy Levels” you marked for each test weld and determine which setting provided a 100% 

bond. Re-set the tool to that setting. 

 

Remember if you are working in “Manual” Mode you’ll need to adjust the calibration whenever the temperature on 

the roof changes by 15°F or more (8°C or more).

Summary of Contents for RBT007

Page 1: ...v 06252020 153 BOWLES ROAD AGAWAM MA 01001 USA 800 633 3800 413 789 0252 RHINOBOND COM Non penetrating fastening system for commercial roofing IMPORTANT Save this manual and read it in full before use...

Page 2: ...le easy to use system that secures membrane to roofing substrates using micropro cessor controlled induction welding Roofing installed this way has several benefits Fewer Fasteners RhinoBond requires...

Page 3: ...conditions Keep the tool dry at all times ALWAYS ENSURE that the tool is properly grounded CFCI Circuits are best and that power is from a safe and reliable source ALWAYS WEAR proper personal protecti...

Page 4: ...z 220V 50Hz EXTENSION CORD 12 gauge min 100 ft max 110V 2 5mm X 30m 16A 230V 3x15 30m 10A 30m PORTABLE GENERATOR POWER SOURCE 5 000W min with 2 20A GFCI Circuits 2 5 KVA min with 16Amp 110V protected...

Page 5: ...s under each plate to protect the insulation from melting On foil faced insulation the recommended minimum cover board is 1 in 38 mm Metal Deck A minimum of 1 inches 38 mm of insulation over a metal d...

Page 6: ...progress If necessary you can calibrate the touch screen at this time To do so touch this screen once to begin the calibration process see below Once startup is complete the screen will display the L...

Page 7: ...es can be reviewed Power Display The Power Display shows the line voltage the tool is receiving from the power source The tool requires a minimum of 100 volts to operate effectively Menu Pressing this...

Page 8: ...ce of membrane from the project weld each plate and apply a magnetic heat sink to each Allow plates to cool to the touch approx 5 minutes before removing the magnetic heat sinks Turn the membrane over...

Page 9: ...gy Level setting push the plus or minus buttons Push the Home button once the energy setting is set The screen will automatically return to the Device Ready screen The Device Ready screen will display...

Page 10: ...gnetic cooling clamp on the plate and mark the energy setting on the membrane for reference Adjust the Energy Level to the next higher setting and repeat the test weld process until all five plates ar...

Page 11: ...arrow to return to the previous screen Press the Sound button to change the Activation Complete tone The sound can be enabled by press ing the On button and disabled by pressing the Off button You ha...

Page 12: ...t factory reset Press the Home button to return to the Device Ready screen Press the back arrow to return to the previous screen From the main Menu press the Help button to access OMG Roofing Products...

Page 13: ...main Menu press the Help button to review the Troubleshooting tips and error message descriptions Press any of the error message buttons to get more information and recommendations Press the back arro...

Page 14: ...Voltage Directive LVD 2006 95 EC The following harmonized standards were applied LVD EN60335 1 2012 A11 2014 EN60335 2 45 2002 A2 2012 RhinoBond Induction Welding Tools wielding the CE Mark comply wi...

Page 15: ...RhinoBond Owner s Manual Page 15 NOTES...

Page 16: ...OMG Roofing Products 153 Bowles Road Agawam MA 01001 USA 800 633 3800 413 789 0252 www rhinobond com...

Reviews: