Calibration Instructions
20
3
3.2 Set-Up of Equipment
To prepare the ice bath:
a) Fill a glass beaker with crushed ice made from distilled water.
b) Fill the beaker with enough distilled water so that the ice just
becomes slush, but not enough to float the ice.
c) Insert the reference thermocouple.
Figure 3-2 shows an alternate set-up. Here, a high precision
thermocouple calibrator, such as the OMEGA Model CL511, replaces
the DVM, ice bath, voltage source, etc.
Summary of Contents for TX93
Page 8: ...Introduction Figure 1 1 TX93 Transmitter Figure 1 2 Dimensions in inches 2 1...
Page 10: ...Figure 1 3 TX93 Thermocouple Transmitter Introduction 4 1...
Page 20: ...Installation 14 2 Figure 2 3 TX90 BR Mounting Bracket Dimensions in inches...
Page 21: ...2 15 Installation Figure 2 4 Installation with the Bracket and Track Dimensions in inches...
Page 22: ...Installation 16 2 Figure 2 5 TX 90 DIN DIN Rail Mounting Adapter in Inches...
Page 24: ...Installation 18 2 Figure 2 6 Wiring Diagram for the TX 93...
Page 29: ...3 23 Calibration Instructions Figure 3 1 TX93 Calibration Set Up...
Page 30: ...Calibration Instructions 24 3 Figure 3 2 TX93 Calibration Set Up Alternate...
Page 40: ...6 Notes 34...
Page 41: ...6 Notes 35...
Page 42: ...Notes 6 36...