![background image](http://html2.mh-extra.com/html/omega/oal-100/oal-100_instalation-instructions_3940010007.webp)
I
nputs/
O
utputs:
Notes:
-
C
onnecting terminals COM to ACT1 will activate the operator to open
-
P
ush buttons, card readers etc will all wire the same
-
M
ultiple inputs can be wired together
-
U
se 20 gauge wire
Push B
uttons
S
trike
Notes:
- use terminals
LOCK
&
+24
to signal
strike
- use 20 gauge wire
P
rogramming
F
unctions
R
ange
U
nits
D
efault
1. overload
50-99
%
50
2. activation delay
0-99
0.1seconds
0
3. back check
0-99
%
20
4. holding time
0-99
1.0 seconds
15
5. opening speed
10-70
%
50
6. closing speed
0-99
%
20
7. latching speed
0-99
%
5
8. hold open
0-1
on/off
0
9. power assist
0-1
on/off
0
10. reactivation
0-1
on/off
0
O M E G A A U T O M A T I C S
2 0 1
8
V
2
.
0