![background image](http://html2.mh-extra.com/html/omega/oal-100/oal-100_instalation-instructions_3940010005.webp)
on/off
switch
control board
to motor
to magnet
switches
use jumper wire
from COM
to ACT
1
to hold open
W
iring:
120 VAC
to be connected
by
authorized electrician
Notes:
-
R
un 120 VAC power lines as per building code
-
R
un low voltage wires to/from any input/outputs such as buttons or strikes
-
P
ower is to be connected by authorized electrician to local codes
-
O
nce power is hooked up the unit can be test cycled by pressing "ACT"
-
E
nsure that operator is working properly before adding inputs/outputs
-
M
agnets must be properly positioned in order for operator to function (see setting the magnets)
-
F
ull open position is limited by an internal stop not the magnets
-
T
he magnets confirm the door position to the control board
-
M
agnets can be adjusted to change the point where the door slows for back check and latch
-
U
se a jumper wire to hold operator in full open position to attach arm.
-
Have certified Electrician
to do
installation ONLY!
-
Have certified Electrician to hook the wire into the power side properly.
-
Add the L1, N, and G labels on the wires before installing the system.
T
est &
H
old
O
pen:
press ACT to test
O
M
E
G
A A
U
T
O
M
A
T
I
C
S 2
0
1
8
V
2
.
0