6
Installation
Warning
Before installing the device, check that the system is not
under pressure. Wear necessary personal protective
equipment and keep folow the safety rules when working
with pressure equipment.
Before connecting the drain, blow compressed air through the piping in order to
thoroughly clean out any impurities within it.
Install the AOK 20SS at a level below the receiver, if not the receiver will fill up with
condensate.
It is recommended to install a ball valve between the device and the system. This is
done to ensure easy maintenance work on the device without the needed to empty
the entire system. In addition to the ball valve it is also recommended to add
strainer, and then the nipple tubing (17) to allow the flow of air upward.
After initial run, open AOK 20SS and clean all components.
It is strongly recommended that waste condensate from discharge port is connected
to water treatment application, such as WOSm series water oil separator to protect
the environment from pollution and to comply with environmental laws.