9. Use and maintenance manual
B01.15-B02.42
San Maurizio C.se - 16/12/2020
www.omcr.it
In case of lifting and handling, the lifting bracket capacity load should be at least
1/2
of the whole die weight.
(upper half-die + lower half-die).
Example: Die weight 8.000 kg - minimum lifting bracket capacity load: 8.000 / 2 = 4.000 kg
In case of half-die overturning the lifting bracket capacity load should be at least
1/2
of the half-die weight.
Example: Half-die weight 4.000 kg - minimum lifting bracket capacity load: 4.000 / 2 = 2.000 kg
Before each lifting / handling / overturning of the die, check that the chosen sling system
(rope/chain, hook, etc.) doesn’t present any defect or deformation to make it unsafe;
otherwise replace immediately the damaged parts
.
WARNING
3.7
To prevent the pin accidental extraction, don’t make lifting / handling / overturning with sling
angle bigger than 90° from the horizontal level (see
Pic.4
).
WARNING
3.8
DIE AXIS
DIE AXIS
Pic.4
MAX 90°
MIN 50°
< 50°
Before each lifting / handling / overturning of the die be sure that:
the ropes / chains are secured in correct way;
the ropes / chains are not in contact with cutting edge;
the ropes / chains are not hooked to the die corners.
WARNING
3.9