Installation
FLUE CONNECTION
Make the flue connection as follows:
• Locate the fryer under a hood with adequate connection to an exhaust duct. The hood must extend 6” (15
cm) beyond fryer on both sides.
• Clearance above the fryer should be adequate for combustion by-products to be removed efficiently.
• An 18” (46 cm) minimum clearance should be maintained between the flue vent and the filters of the hood
venting system.
• Never make flue connections directly to the fryer.
• Do not obstruct the flow of the gases from the appliance. Proper air balance should be maintained in the
room.
GAS CONNECTION
All gas supply connections and any pipe joint compound must be resistant to the action of propane gases.
The gas inlet is located on the lower rear of the fryer. Codes require that a gas shutoff valve be installed in the
gas line ahead of the fryer.
The gas supply line must be at least the equivalent of ½” (12.7 mm) iron pipe for single units and 1-1/4” (31.75
mm) for batteries. If using the optional quick-disconnect flex hose, ¾” (19 mm) iron pipe for single units and
1-1/4” (31.75 cm) iron pipe for batteries. Make sure the pipes are clean and free of obstructions, dirt, and
piping compound. A battery requires one or two connections of appropriate size for the gas requirement.
Warning: prior to lighting, check all joints in the gas supply line for leaks. Use soap and water solution.
Do not use an open flame.
After piping has been checked for leaks, fully purge gas pipes to remove air.
GAS PRESSURES
The available gas pressure should be the same as that indicated on naming plate. If incoming pressure
exceeds 5 kPa, an additional pressure regulator must be installed.
TESTING THE GAS SUPPLY PIPING SYSTEM
When test pressures exceed 5 kPa, the fryer and its individual shutoff valve must be disconnected from the
gas supply piping system.
LEVELING THE FRYER
Check the level of the fryer by placing a level on top of the fryer after gas connections have been made.
Ensure that the fryer is level front-to-back and side-to-side in the final installed position. If using casters, lock
the wheels after unit is level.