
13
Installation
STEP 9
1. Put the gas system pre-installed assembly as shown in the line drawing, pass 40” and 46” through 51”, as
shown in Figure 1, place it at 45”, use cable ties to bind.
2. Manually align 39” to 47” and tighten clockwise as shown in Figure 3 and Figure 4.
STEP 10
1. Door handle mounting.