background image

Page

 

3

 

from

 

4

926021003_0

9

_00

4

INSTALLATION INSTRUCTIONS 

1. In order to remove the front cover, unscrew the 4 retaining screws

.

 

2. 

Mark the 

4 points

 in the installation area

After installing the plastic plugs in the wall mount

    the luminaire with the mounting screws

3. Make sure that the battery’s cables are connected to the respective poles. Black cable to (-)
    pole and red cable to (+) pole.
4. 

Always use in any case round mains cable

,

 with diameter

 

of 

6-9

mm (H05RN-F 

    type 3x1mm² 

or 

any 

other type

,

 

at least 

equal 

to it’s mechanical and electrical

    properties).   
    ATTENTION!! The cable must not be deformed in any way (This requirement is
    important to ensure the tightness isolation IP 65). 

Install

 

the cable gland

,

 pass the round

    cable through

 

and tighten it all the way. 

5. 

Connect the wires to the terminal blocks 

L for live wire, 

Ν 

for

 

neutral

 

and 

      

for the

    ground

.

6. 

Battery protection fuses

When the spot lights

 

are not functional in emergency mode, check

    these fuses and replace them if necessary 

(

one fuse corresponds to each spot light)

.

7. 

Refit with care the front cover, by fastening the 4 retaining screws (tightening torque 1Nm)

.

mains’ power 

supply cable

entry

4

TEST button 

and

charge indication

retaining 

screws

front cover

1

1

Minimum distance from lighted objects.

Front cover retaining screw

Mettalic

washer

Rubber
washer

Mounting screw

Reviews: