1. Install the included mounting accessories to hook the device from the mounting holes (fig. 1)
.
2.
Unfasten the 4 mounting screws to remove the front plastic cover (fig. 1)
.
3. Make sure that the battery’s cables are connected to the respective poles. Black cable to (-) pole
and red cable to (+) pole.
4. Install the included cable gland or the rubber o-ring. Pass through the mains cable and stabilize it
by fastening the cable gland. Connect the wires to the terminal blocks
L
for live wire and
Ν
for
neutral
.
5.
Refit with care the front plastic cover, by fastening the 4 mounting screws (tightening torque
1N
*
m).
NOTE!! After finishing the installation you must power the luminaire at least for 24 hours for
battery charging to perform the nominal autonomy.
INSTALLATION PROCEDURE (For wall mounting only)
Page
3
from
7
92303
7
00
8
_09_00
1
INDICATION LED STATUS (with the mains power supply connected
)
Battery replacement
It can be done only by a competent person and after the mains interruption.
1.
Follow the step 2
o
f the installation procedure.
2.
Disconnect the
cables
and remove the old
battery.
3.
Connect the new battery with the same type (step
3
of the installation procedure) and place
it
i
n
the
position
of the old one.
4.
Follow the step
6
of the installation procedure
and
power the device.
POWER / CHARGE
LAMP FAULT / BATT. FAULT
Disconnected battery
/
not charging
Normal operation mode
Charged battery
Low emergency duration
(
replace battery
)
Battery under charge
Lamp fault (Check lamps and replace if needed)
Indicator ON
Indicator Blinking
Indicator OFF
N
4
3
L
TEST
button
Fig
.
1
POWER
CHARGE
indicator
Mounting holes
LAMP FAULT
BATT. FAULT
indicator
Cover
retaining
screws