background image

1

Required opening

14.5x14.5cm

4

3

4

6

8

9

wall plug

wall plug

screws

screws

plastic

mounting

bracket 

luminaire’s

base

923493000

_0

9

_003

Page

 

4 from

 

7

MOUNTING IN SUSPENDED CEILING

1. Detach the front cover by applying pressure using a flat blade screw driver. Next, unfasten the four
    retaining screws (figure 1) without removing them and remove the diffusor.
2. Install the supplied cable grommet from the inside of the plastic base (figure 2).
3. Install the two plastic brackets with the four screws (figure 3)

.

4. 

Mark the positions of the mounting holes on the brackets.

5. 

Install the two supplied plaster board plugs by screwing them on the plaster board ceiling.

6.

Open a cable entry cutout hole on the plastic base and follow step 3 in the “

initial installation

   section

.

7. 

Re-install the front cover that was removed in step 1.

8. 

Use the supplied screws to fasten the luminaire to the plaster board plugs (figure 8) that were

    previously installed on the plaster board ceiling.

9. 

Finally, install the supplied decorative bezel (figure 9). The notch on the bezel must be

    located on the left side of the luminaire (figure 10).

2

Summary of Contents for GR-490/WP

Page 1: ...can be conducted by holding the A 1900 card steadily for 5 to 10 seconds In order to be performed the mains power supply and the battery should be connected The luminaire enters emergency mode the cha...

Page 2: ...mote module address module wireless module and fault relay module If you connect it to a module that supports inhibit or rest mode you should know that these commands can be cancelled only during norm...

Page 3: ...cable through the hole in the grommet If required open another cutout cable entry hole and install the second supplied cable grommet Connect the cables as shown in the photograph Use the supplied self...

Page 4: ...o plastic brackets with the four screws figure 3 4 Mark the positions of the mounting holes on the brackets 5 Install the two supplied plaster board plugs by screwing them on the plaster board ceiling...

Page 5: ...ed in the plastic base 3 Place the luminaire on the desired mounting location and mark and drill these 4 holes Fit the supplied 4 plastic mounting plugs to these drilled holes on the mounting location...

Page 6: ...eset errors you must place the card in front of TEST by holding it for 10 to 15 seconds and removing it 923493000_09_003 Page 6 from 7 Battery replacement It can be done only by a competent person and...

Page 7: ...vided or has any repairs or re setting done by a third party unless Olympia Electronics has fully agreed to them in writing Products that have been damaged can be returned to the premises of our compa...

Reviews: