30.
Position and attach
Side Top Plates
on
Side
Riser Plates
. 65 3/4” side plates are on the outside
with the 45 1/2” plate in the center. Angle of
Side
Plates
should match angle of
F&R Top Wall
Plates
. Attach each piece with
4 - 1 1/4” screws
.
Complete both sides of shed.
Parts (Steps 30)
Side Top Plates
(3/4” x 2 1/2” x 45 1/2”)
x 2
(3/4” x 2 1/2” x 65 3/4”)
x 4
Hardware (Steps 30)
S2
- 1 1/4” Screws
x 24
total
Top and Side
plates flush
31.
Locate Triangular
Gable Half Walls
for both
sides of shed. Align framing and wall siding lap
together. Screw center wall framing of each piece
together with
4 - 2 1/2” screws
. Note: Prior to
attaching, try each combination of Gables for best
fit.Tip of Gables are separate pieces that need to be
attached on in
Step 32
.
Parts (Steps 31-32)
Gable Half Walls x 4
Hardware (Steps 31-32)
S1
- 2 1/2” Screws
x 8
total
S3 - 2” Screws
x 8 total
Male / Female Gable
Siding Overlap
Gable End tucked inside
Gable.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 20