Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 25
54.
Place Roof Panel so it sits flush on 3rd rafter from the outside (doubled up rafter). Plywood on
roof should be flush with end of rafter at bottom. From the outside, screw down through plywood into
rafter with 1 - 2 1/2” screw. Additionally, angle a 2 1/2” screw from outside rafter into roof plywood.
Position Center Roof Panel on both doubled up rafters.
Outer
Roof
Panel 48”
wide.
Centered
and 1/4”
back.
2 3/4” past
rafter
Short Roof Side
55.
Screw Panel to Rafters through with 6 - 1 1/4” screw. Lift up and place a Long Center Roof
Panel on Rafters
(45 1/2” wide)
. Center Panel evenly on double rafters.
56.
Position Center Plywood Roof Panel so recessed back from the end of the rafters by 1/4” and
attach to rafters as per
Step 55
.
Slightly past
ridge board.
Center
Panel
45 1/5”
wide.