Plywood Floor

Large Floor 
Joist Frame

Floor Joists (2)

Floor Runners 
Short (2)

Small Floor 
Joist Frame

Exploded Floor Section

A. Floor Section

Exploded view of all parts necessary to  
complete Floor Section. Identify all parts 
prior to starting.  Note: Floor Footprint is  
96” wide x 45 1/2” deep.

Foundation Material 
not included.

1. 

 Lay out 

Large Floor Joist Frame 

and

 2 Floor Joists 

(1 1/2” x 3 1/2” x 71 7/8”) as illustrated 

above. Position Joists equally in Floor Joist Frame. Use 

Small Floor Joist Frame

 as a template to 

determine joist position. Position Joist so flush with framing. 

Flush 
with 
framing.

Front of GardenSaver

Door Location.

Small Floor 
Joist Frame.

You can find the 
Square Drive Bit, for 
the screws, in the 
Hardware Kit Bag.

2. 

When correctly positioned, attach each Joist with 

4 - 2 1/2” Screws (2 per end)

. You can find 

the Square Drive Bit for the screws in with the Hardware Kit Bag.

Floor Runners 
Long (3)

  Toll Free 1-888-658-1658              www.outdoorlivingtoday.com        [email protected]

Page 7

Summary of Contents for SS84-SLIDER-METAL-AK

Page 1: ...rovided free of charge after the 30 day grace period All structures purchased from Outdoor Living Today are covered for a period of one year for defects in manufacturing and workmanship Costs incurred...

Page 2: ...ide on the type of foundation you will be using Concrete slab or 4 6 inches of crushed gravel with paver stones or 4x4 stringers You can nd the footprint for your shed on Page 3 of your Assembly Manua...

Page 3: ...d of floor frame Saves money on materials easy to level and work with Gravel with Patio Paver Stones Excavate at least 6 deep and 6 wider than floor frame on each side 1 0 Cubic Yards of gravel requir...

Page 4: ...58 1 2 d Step 42 48 Foam Enclosures for Metal Roof Several Strips Step 47 66 D Miscellaneous Section Skirting Trim Door Facia Misc Parts 4 x 4 x 45 Bottom Skirting Bevel Siding 2 3 4 x 4 x 45 1 4 Fro...

Page 5: ...e Hammer Wood Clamp Level Pliers Tools Required Not Provided 1 8 1 2 Drill Bits Utility Knife 2 1 2 1 1 4 3 4 90 Metal Bracket x 4 1 1 2 Finishing Nail 175 Pcs 140 Pcs 12 Pcs 245 Pcs Black Headed Blac...

Page 6: ...Wall Panel Small gap between bevel siding and window trim Dab of caulking Strip of roofing paper over apex of roof panels Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday...

Page 7: ...8 as illustrated above Position Joists equally in Floor Joist Frame Use Small Floor Joist Frame as a template to determine joist position Position Joist so flush with framing Flush with framing Front...

Page 8: ...n not to bend or twist floor Note Having a level foundation is critical Choosing a foundation will vary between regions Typical foundations can be concrete pads or patio stones positioned underneath t...

Page 9: ...x 45 1 2 Attach Plates to bottom of studs of each wall panel with 3 2 1 2 Screws Position so plates are flush with framing Note Plywood is cut slightly smaller than floor framing Keep plywood seams ti...

Page 10: ...ioned correctly locate 2nd Solid Wall Panel and place in corner Wall Plate Flush with floor frame Do not align wall siding to floor Align wall plate to outside of floor frame 12 Butt both vertical wal...

Page 11: ...attach both wall panel studs together as per Step 12 with 3 2 1 2 Screws 14 With Rear Wall Panel in place position other side wall panel on floor as per Step 10 11 Rear Wall Panel 15 Secure side wall...

Page 12: ...tach short header using 2 2 1 2 Screws as shown above 18 Locate Front Left Corner Filler Trims 2 1 2 x 2 1 2 x 36 and Door Jamb 1 1 2 x 3 1 2 x 73 Attach both Fillers with 4 1 1 2 Finishing Nails as s...

Page 13: ...g on wall extender and align as shown above Attach with 3 1 1 2 Finishing Nails to top wall framing There are left right top siding pieces Use rough surface side out Place finished wall extender on si...

Page 14: ...framing flush with inside edge of wall framing Overhanging siding on front of extender will rest in notch of Header 25 Attach Wall Extender to both the Angled Wall Extender framing and the Door Heade...

Page 15: ...tach with 3 2 1 2 screws Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 15 27 Align Horizontal Wall Cleats 1 3 4 x 3 1 2 x 70 1 3 4 x 3 1 2 x 21 flush with top o...

Page 16: ...asurements are not within 1 4 your walls are not square Adjusting now will make it easier to install roof section 99 1 4 29 Position and attach Front Right Corner Filler Trims 2 7 8 x 2 1 2 x 36 with...

Page 17: ...rrectly on the floor Refer to Step 11 Wall siding should overhang floor while 2x3 wall plates should sit flush with floor Bottom Wall Optional Caulking seams will help prevent moisture from entering a...

Page 18: ...ve Measure and attach remaining Soffit Rafter connections using 2 1 1 4 screws per rafter soffit Front Soffit Boards 2 A B C Rear Soffit Screw center rafters together with 3 2 1 2 screws Toll Free 1 8...

Page 19: ...sit approximately 1 8 away from wall siding This can vary slightly 32 Carefully flip completed Rafter Section over so Front Soffit is facing the front and place on SpaceSaver walls Note Double check t...

Page 20: ...e of Door Header at front of shed and inside Extension Wall framing at rear of shed behind Horizontal Wall Cleats Front 37 Position the first row of Battens 3 4 thick x 3 1 2 wide x 50 on front of roo...

Page 21: ...ush with previously attached Batten Spacers as per Step 37 Attach a second row of Batten Spacers flush with bottom edge of the middle battens as per Step 38 40 Locate final row of Roof Battens 3 4 thi...

Page 22: ...ching Side Facia 42 Locate Metal Roof Hangers 3pcs and Metal Roof Panels 3pcs 39 wide x 58 1 2 long To temporarily help hold Metal Roof Panels in place hook a Metal Roof hanger onto the lower Batten a...

Page 23: ...nd rear will be set by the Metal Roof Hangers but should be approximately 1 at the rear and 4 at the front 3 4 Overhang 44 Adjust the position of remaining Metal Roof Panels on Battens as per Step 43...

Page 24: ...from a helper for this step Bead of Caulking 46 Using 4 2 Metal Roof Screws and 1 4 Nut Driver included partially secure Metal Roof Panels down to middle Batten row Only fasten screws halfway so that...

Page 25: ...ed through here Remove Metal Roof Hangers 48 Using 4 2 Metal Roof Screws and 1 4 Nut Driver secure Metal Roof Panels down to lower front Battens Tighten screws in Middle Batten row that were partially...

Page 26: ...tach Bottom Skirting 4 3 4 x 4 1 2 x 45 1 4 bevel around the base of the shed Skirting will hide floor framing Start with side skirting pieces first and attach with 4 1 1 2 Finishing Nails per piece F...

Page 27: ...ll be two 36 long fillers and one 10 piece per corner Position with a slight gap in the middle and attach with 4 1 1 2 Finishing Nails per 36 piece and 2 1 1 2 Finishing Nails per 10 piece Skirting me...

Page 28: ...e same 5 1 2 Side Skirting 55 To completely trim out front corners locate Side Front Corner Trims 1 2 x 2 1 2 x 80 and Front Corner Trims 1 2 x 5 1 2 x 79 Align and attach as per Step 53 53 To Trim ou...

Page 29: ...g Nails aligning tight underneath soffit and center on seam 57 Position Aluminum Door Track on bottom of Front Soffits spaced approximately 1 2 from edge of door header on either side Attach with 8 1...

Page 30: ...onto door with 4 1 1 4 Screws per Assembly center on the door framing 12 1 2 from each end as shown above 1 Door Stop 58 Locate Sliding Door and flip over onto a clean dry and level spot Position Door...

Page 31: ...r Door Tracks and Door Stops Center Door Track side to side and resting on Long Floor Runners Bottom of Door Stops and Door Tracks should be flush with each other Secure Door Track to shed with 9 3 sc...

Page 32: ...edges of Door Stops This creates an enclosure so the door can not slide out of the track Track Cover with 6 2 1 2 screws Door Track Cover flush with top of Door Stops on both sides Toll Free 1 888 65...

Page 33: ...ia and then attach the front with 6 1 1 2 Finishing Nails Attach side with 5 1 1 2 Finishing Nails securing them into the nailing strip closer to the top of the side facia board Attach next piece of F...

Page 34: ...al Roof Panels Space evenly from side to side before attaching Metal Ridge Cap in Step 67 67 Place Metal Ridge Caps on top of Metal Roof at the rear of your shed Evenly space from side to side allowin...

Page 35: ...1 4 Screws Caulk gap between siding and window at top This requires a large amount of caulking but is important to fill Later Window Trims will be installed to hide caulking 70 Position Window Trim a...

Page 36: ...me Shipping 3 Motor Freight Delivery 4 Quality of Materials 5 Assembly Manual 6 Overall Satisfaction The materials contained in this Assembly Manual may be downloaded or copied provided that ALL copie...