45.
Position and attach Roof Panels on the other side as per
Steps 41 - 44.
46.
Roof
Filler Shingles
are included to cover roof seams.
Starting at the bottom, slide the first Long Shingle in until flush
with other bottom shingles.
Parts (Steps 46 - 48)
Filler Shingles - Long x 16
Filler Shingles - Short x 4
Hardware (Steps 46 - 48)
S1
- 2 1/2” Screws
x 32 total
N2
- 1 1/2” Shingle Nails
x 8 total
Attach above
the exposure
line.
Exposure
Line
47.
Screw first filler shingle down to rafters
using
1 - 2 1/2” Screw
per panel (2 in total).
Make sure to screw into both rafters.
44.
Lift up, position and attach 2nd
Outside Roof Panel
on Rafters as per
Step 42
.
Outside Panel
Middle Panel
Outside Panel
Shingles overhang plywood
on Outside Roof Panel.