Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 11
14.
Position
2D - Door Header - Short
on top
of wall stud so it is flush on the inside with 2x3
wall stud. Attach by screwing down into top wall
framing with
3 - 3” Screws
.
Parts (Step 14 - 15)
2D - Door Headers - Short
(2” x 3 1/2” x 26 1/4”)
x 2
2E - Door Header - Long
(2” x 3 1/2” x 84”)
x 1
Hardware (Step 14 - 15)
S4 - 3” Screws
x 10 total
S2 - 1 1/4” Screws
x 2 total
Step to front
and top.
Align flush
outside with
wall siding.
15.
Attach
2D - Door Header - Short
to other side. Position and attach
2E - Door Header - Long
between short door headers. The Long Door Header has an aluminum strip attached to the back for added
support. Attach by screwing down into wall framing with
2 - 3” Screws
per side. Fasten aluminum strip to
short headers with
1 - 1 1/4” Screw
per side.
Aluminum strip on back
of Long Door Header
Door Header
overhangs
inside wall
framing by 1/2”