background image

Toll Free 1-888-658-1658         www.outdoorlivingtoday.com          [email protected]

9 ft Naramata Spa Shelter

Assembly Manual

Outdoor Living Today 

Thank you for purchasing a 
Naramata /Getaway Spa Shelter from 
Outdoor Living Today.  Please take
the time to identify all the parts 
prior to assembly.  

Safety Points and Other Considerations
Our products are built for use based on 
proper installation and normal residential use, 
on level ground. Please follow the 
instruction manual when building your 
shelter and retain the manual for 
future maintenance purposes.

Some of the safety and usage measures you may wish to consider include:
-snow load ratings vary by geographical location. If heavy or wet snowfall 

occurs, it is  advisable to sweep the snow off the roof(s). 

-if the product is elevated, any structural and building code requirements are 

solely the customer's  responsibility, and should be abided by. 

-in high or gusty wind conditions it is advisable to keep the structure securely grounded. 
-have a regular maintenance plan to ensure screws, doors, windows and parts are tight. 

Customers agree to hold Outdoor Living Today and any Authorized Dealers free of any liability for
improper installation, maintenance and repair of any Outdoor Living Today products.

In the event of a missing or broken piece, simply call the Outdoor Living Today
Customer Support Line @ 1-888-658-1658 within 30 days of the delivery of your 
purchase. It is our commitment to you to courier replacement parts, free of charge, 
within 10 business days of this notification. Replacement parts will not be 
provided free of charge after the 30 day grace period. 

Version #8

Feb 20th, 2015

Summary of Contents for Naramata

Page 1: ...ble to sweep the snow off the roof s if the product is elevated any structural and building code requirements are solely the customer s responsibility and should be abided by in high or gusty wind conditions it is advisable to keep the structure securely grounded have a regular maintenance plan to ensure screws doors windows and parts are tight Customers agree to hold Outdoor Living Today and any ...

Page 2: ...aps 4 10 long Cedar Roof Ridge Caps with Roofing Paper attached 4 42 long x 3 wide Flex Flashings for Skylight 4 1 2 x 3 1 2 x 36 long Skylight Trims Assembly Time 1 Day does not include site preparation Specifications Outside Post to Post Dimensions 108 w x 108 w Inside Post to Post Dimensions 101 w x 101 w Overall Dimensions with Roof Overhang 120 w x 120 w x 116 h Overall Weight 750 Lbs Thank y...

Page 3: ...t Important Assembly Manual shows illustrations for Naramata Model Please follow general assembly instructions for Naramata Refer to Parts List for any differences between Models Safety Glasses Work Gloves Safety Equipment Required Not Provided Ladder Screw Gun Drill Tape Measure Hammer Wood Clamp Level Pliers Tools Required Not Provided 1 8 Drill Bit Toll Free 1 888 658 1658 www outdoorlivingtoda...

Page 4: ...st Baluster Assemblies will be easier with 2 extra helpers Carefully raise one of the section up first and steady with 1 helper Raise the second assembly up and steady with your other helper 6 While both sections are held in place by your helpers locate a 3rd Upper Baluster Section and place between both sections Have your helper stand close to your end to assist you with the lifting of the Balust...

Page 5: ...ion into place so both post and framing are flush with each other as per Step 2 8 When positioned correctly attach Upper Baluster Section to Post with 4 2 1 2 screws per side as described in Step 3 At this stage the post baluster assemblies should be able to support themselves 9 Complete the final Upper Baluster Attachment ...

Page 6: ... position on top of post baluster assembly 11 Place Top Plate so the 45 degree cut on the end sits over the post approximately halfway as illustrated above When positioned correctly attach to post baluster assembly with 4 2 1 2 screws per piece Make sure to place a screw from top plate into post Drill pilot hole to prevent splitting 2 1 2 screw 2 1 2 screw 12 Position 2nd Top Plate on post baluste...

Page 7: ...n 3rd Top Plate down and attach to post baluster assemblies as described earlier 3rd Top Plate Both Top Plates should be flush and sitting on the post equally 14 Complete remaining Top Plate attachments working in a clockwise direction When completed you are ready to start Corner Bracket Attachments ...

Page 8: ...drilled holes Important Do not over tighten bracket screws Use screw driver to finish off centered on bottom of baluster section centered on post Note Prior to attaching Brackets use a level to square up your posts 16 Complete all remaining Corner Bracket attachments Even though Corner Brackets are engineered to be exactly 90 degrees use a square or a level to align your post prior to attaching ea...

Page 9: ...ter Rafters to Skybox first attach Simpson Strong Ties long side down to bottom of rafter Attach tie with 2 1 1 4 screws where rafter angle changes Toenail 2 1 2 screw Corner Rafter flush to bottom of Skybox 18 While your helper holds up the Skybox attach the first Corner Rafter to the Skybox from the inside Secure the Corner Rafter to the Skybox with 2 2 1 2 screw Screw into seam of Skybox straig...

Page 10: ...ttom Complete all other Center Rafter Skybox attachments Important Be careful not to bend or scratch attached Simpson Strong Ties Toenail with 2 1 2 screw Center Rafter Center Rafter Inside of Skybox Strong Tie Mid Rafter is positioned on edge of Skybox Mid Rafter no cleat M id Rafter 21 Prior to attaching Center Rafters find the Skybox midpoint 18 5 on center Secure rafter at midpoint with 2 2 1 ...

Page 11: ...lift up your completed rafter section and place on top of your post baluster section Position Rafters in their approx location Birds eye view of rafters sitting on top plates 26 When inside the Naramata the Center Rafter Simpson Strong Tie should sit flush against Top Plate and be centered between posts Check all Center Rafter locations and when positioned correctly screw the Strong Ties into Top ...

Page 12: ...nally to secure Corner Rafters position Locking Corner Lock Blocks in bottom corner or Corner Rafter and secure with 2 2 1 2 screws Complete all 4 corners 30 From the outside attach all 4 Black Aluminum Corner Post Top Plate Caps to top of outer post in corners Use 2 2 black screws to secure Caps should be flush with Top Plate and Corner Rafter Corner Post Top Plate Caps not included in Getaway Mo...

Page 13: ...els 32 Place Right Sided Panel so it sits approximately 1 2 way on the Center Rafter 33 Position roof so panel sits flush in Dado Slot of Skybox and is centered approximately 1 2 way on Center Rafter 34 When Right SIded Roof Panel is positioned correctly attach roof panel to Corner Rafter with 3 2 1 2 screws DO NOT SCREW ROOF PANEL DOWN TO CENTER RAFTER AT THIS POINT 1 2 way on rafter S k y B o x ...

Page 14: ... reposition roofs slightly after all the panels are up to get the best fit for your Naramata 37 Continue adding Roof Panels Remember there will be small seams between roof panels that will be covered later It is more important to center the panels correctly on the rafters 38 The illustration to the right shows the Naramata with all the roof panels positioned correctly on the roof rafters Once agai...

Page 15: ... to Center Rafters as per Step 40 Screw first filler shingle down to rafters using 1 2 1 2 screw per panel 2 in total Make sure to screw into both rafter attach above the exposure line exposure line 42 Locate all Roof Ridge Caps Note Ridge Caps are offset to one another Place 1st Ridge Cap on roof seam slightly overhanging roof end and attach with 2 1 1 4 Shingle Nails Position 2nd Ridge Cap offse...

Page 16: ...Complete remaining Long Ridge Caps On top of the roof carefully position Skylight Roof Flashing on Skybox Space evenly from side to side on Skybox making sure Flashing does not protude past the Skybox on the inside Staple down to Skybox when in correct position 7 1 2 7 1 2 45 Complete alignment and attachment of remaining Flashing Strips as per Step 44 Toll Free 1 888 658 1658 www outdoorlivingtod...

Page 17: ...r of plastic Lift up and carefully place the skylight into position on the Skybox The Skylight is pre drilled for your convenience Use 8 2 black screws with neoprene washers to attach Screw down so Skylight is snug only Do not overtighten or Skylight will crack Hand tighten only 47 Position Skylight Trim to cover Flashing Drill 1 8 pilot holes near both ends and attach with 2 2 1 2 screws Screw tr...

Page 18: ...ur feedback and would like to hear back from you on how well we are doing in the following areas 1 Customer Service 2 On Time Shipping 3 Motor Freight Delivery 4 Quality of Materials 5 Assembly Manual 6 Overall Satisfaction Please call write or email us at Canadian Address 9393 287th Street Maple Ridge British Columbia Canada V2W 1L1 United States Address P O Box 96 Sumas Washington USA 98295 Outd...

Reviews: