49.
Place 10” long Roof Ridge Cap over Skylight Trim. Align and Drill 2- 1/8” pilot holes in each
end of Cap. Carefully screw Ridge Cap down to Skylight Trim with 2 - 1 1/4” screws. Complete all
corners.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 17
Near end, Hand
tighten Screws to
prevent cracking.
46.
Prior to lifting your
Skylight
into place, carefully
remove the blue protective layer of plastic. Lift up and
carefully place the skylight into position on the Skybox.
The Skylight is pre-drilled for your convenience.
Use 8 - 2” black screws with neoprene washers to
attach. Screw down so Skylight is snug only. Do not
overtighten or Skylight will crack.
Hand tighten only.
47.
Position Skylight Trim to cover Flashing.
Drill 1/8” pilot holes near both ends and attach
with 2 - 2 1/2” screws. Screw trims to rafters if
possible.
Use 1 1/2”
black screws
with neoprene
washers
attached
Drill 1/8” Pilot Hole
in Skylight Trim
prior to attaching.
48.
Complete alignment and attachments
of remaining Skylight Trims as per
Step 47.