40.
With both ridge boards
connected, completely secure gable wall
framing to walls and rafters. Use
3 - 2”
screws (Part E)
per Rafter. Use an
additional
6 - 2” screws (Part E)
to
secure gable to top plate.
Note- you may have to remove the 2
temporary screws in gable wall from
Step 29 and reposition gable for best
fit prior to completing gable
attachment.
Gable Notch.
Ridge Board
Rafter
39.
With ridge board locked into gable notch, align ridge boards so they are flush together and secure
them with
8 - 1 1/4” screws (Part C)
.
Important
- if there is a gap between Ridge Boards, try pushing
rear wall and Door Header closer together from outside. Before moving on with further steps, confirm
your shed is square at wall height by checking the diagonal distance of the top walls on the inside. In
both directions, the distance should be approximately
95 1/2”
depending on where you measure. It is
important that both diagonal measurements are approximately equal. If not, adjust walls until an equal
distance is achieved.
Screw
Ridge Boards
together with
1 1/4” screws
1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 19
95 1/2”
41.
With walls all square, secure rafters to top wall framing and top plate at the rear with
1 - 3” screw
(Part D)
per rafter. Screw through wall frame and top plate at an angle.
Top W
all Framing
7
0”