background image

Bottom of bracket flush with  
bottom of Door Header.

Attach 1 Torx Screw per bracket to hold 
in place while aligning track.

         1

2”

1”

Door Stop

53.

 Once track is evenly spaced from side-to-side (approximately 12” from bracket to wide trim on 

both sides) and bottom of bracket is flush with bottom of header, attach with 

1 - 1 1/2” Torx Screw

 

per bracket to hold in place. Attach 2nd bracket with another 

1 - 1/2” Torx Screw. 

 Check level once 

again. Complete attachment of remaining Torx Screws on brackets of Track.

54.

 Locate Sliding Door and flip over onto a clean, dry and level spot. Position 

Door Stop

  

(1 1/2” x 2 1/2” x 66 7/8”) on left inside frame of door as shown above. Position 1” from outside 
trim of door as shown above. Attach with 

3 - 2 1/2” Screws

 into horizontal door framing.

  Toll Free 1-888-658-1658              www.outdoorlivingtoday.com        [email protected]

Page 27

Summary of Contents for GS84-SLIDER-PLY-FJ

Page 1: ...ded free of charge after the 30 day grace period All structures purchased from Outdoor Living Today are covered for a period of one year for defects in manufacturing and workmanship Costs incurred for...

Page 2: ...ide on the type of foundation you will be using Concrete slab or 4 6 inches of crushed gravel with paver stones or 4x4 stringers You can nd the footprint for your shed on Page 3 of your Assembly Manua...

Page 3: ...d of floor frame Saves money on materials easy to level and work with Gravel with Patio Paver Stones Excavate at least 6 deep and 6 wider than floor frame on each side 1 0 Cubic Yards of gravel requir...

Page 4: ...ter Facia Nailing Strips x x 51 Step 43 D Miscellaneous Section Skirting Trim Door Facia Misc Parts 4 x 4 x 45 Bottom Skirting Bevel Siding 2 x 4 x 45 1 4 Front Bottom Skirting Steps 44 46 6 x 2 x 36...

Page 5: ...Gun Drill Tape Measure Hammer Wood Clamp Level Pliers Tools Required Not Provided 1 8 1 2 Drill Bits Utility Knife 90 Metal Bracket x 4 1 1 2 Finishing Nail 230 Pcs Black Hasp x 1 Roller Assembly x 2...

Page 6: ...Wall Panel Small gap between bevel siding and window trim Dab of caulking Strip of roofing paper over apex of roof panels Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday c...

Page 7: ...o flush with framing 2 When correctly positioned attach each Joist with 4 2 1 2 Screws 2 per end You can find the Square Drive Bit for the screws in with the Hardware Kit Bag Front of GardenSaver Door...

Page 8: ...n not to bend or twist floor Note Having a level foundation is critical Choosing a foundation will vary between regions Typical foundations can be concrete pads or patio stones positioned underneath t...

Page 9: ...re flush with framing Door Header Short Important Pilot hole ALL 2x3 Wall Studs with 1 8 drill bit prior to screwing This will make it much easier to attached together Pilot Hole first Extendor Wall C...

Page 10: ...ioned correctly locate 2nd Solid Wall Panel and place in corner Wall Plate Flush with floor frame Do not align wall siding to floor Align wall plate to outside of floor frame 12 Butt both vertical wal...

Page 11: ...attach both wall panel studs together as per Step 12 with 3 2 1 2 Screws 14 With Rear Wall Panel in place position other side wall panel on floor as per Step 10 11 Rear Wall Panel 15 Secure side wall...

Page 12: ...tach short header using 2 2 1 2 Screws as shown above 18 Locate Front Left Corner Filler Trims 2 3 4 x 2 1 2 x 36 and Door Jamb 1 1 2 x 3 3 8 x 73 Attach both Fillers with 4 1 1 2 Finishing Nails as s...

Page 13: ...l extendor and align as shown above Attach with 3 1 1 2 Finishing Nails to top wall framing There are left right top siding pieces Use rough surface side out Place finished wall extendor on side wall...

Page 14: ...extendor framing flush with inside edge of Header Overhanging siding on front of extendor will rest in notch of Header 1 4 recess 25 Attach Wall Extendor to both the Angled Wall Extendor framing and t...

Page 15: ...ear Wall framing To help strengthen the Rear Walls there is a short and a long wall cleat which meet off center from the seam between walls Attach Cleats with 8 1 1 4 Screws 27 With Extendor Walls att...

Page 16: ...now will make it easier to install roof section 99 1 4 29 Position and attach Front Right Corner Filler Trims 2 3 4 x 2 1 2 x 36 with 4 1 1 2 Finishing Nails per piece Attach Front Top Corner Filler T...

Page 17: ...the floor Refer to Step 11 Wall siding should overhang floor while 2x3 wall plates should sit flush with floor Bottom Wall Optional Caulking seams will help prevent moisture from entering at seam Caul...

Page 18: ...g the width 3 Lay out on level ground and assemble as shown in Illustrations A through C below Attach Soffit Boards flush to end of outside rafters with 2 1 1 4 screws per rafter end Important Drill p...

Page 19: ...and Rear Soffits will sit approximately 1 8 away from wall siding This can vary slightly 32 Carefully flip completed Rafter Section over so Front Soffit is facing the front and place on GardenSaver w...

Page 20: ...nside Rear Wall framing at rear of shed behind Horizontal Wall Cleats Front Rear 37 There are 3 different plywood roof panel sizes required to complete roof 48 wide x 32 long x 2 pcs Long Plywood Roof...

Page 21: ...hang Once positioned attach with 9 1 1 4 screws Pre drill pilot holes and drill into center of rafter Start screws 1 from edge of roof panel and space approximatley 10 apart 40 Locate Center Plywood R...

Page 22: ...ailing surface later when you attach side facia 41 Locate second Small Plywood Roof Panel Position on rafters on rear of shed Attach to rafters with 9 1 1 4 screws as per Step 39 42 Locate second Larg...

Page 23: ...Facia 4 Front Bottom Skirting 2 Track Overlay Front Sliding Door Window Insert Window Trim Aluminum Door Tracks Track Overlay Top Front Middle Trim Side Angle Cut Facia 2 Side Rear Corner Trims 4 Sid...

Page 24: ...tached later There will be two 36 long fillers per corner Position with a slight gap in the middle and attach with 4 1 1 2 Finishing Nails per piece Skirting meets flush in center Skirting meets flush...

Page 25: ...e same 5 1 2 Side Skirting 50 To completely trim out rear corners locate Side Rear Corner Trims 1 2 x 2 1 2 x 80 and Rear Corner Trims 1 2 x 5 1 2 x 79 Align and attach as per Step 49 48 To Trim out f...

Page 26: ...with 8 1 1 2 Finishing Nails aligning tight underneath soffit and center on seam 52 Locate Aluminum Door Track and position above doorway evenly spaced between wide front corner trim Ensure Track is...

Page 27: ...rew per bracket to hold in place Attach 2nd bracket with another 1 1 2 Torx Screw Check level once again Complete attachment of remaining Torx Screws on brackets of Track 54 Locate Sliding Door and fl...

Page 28: ...2 1 2 12 1 2 55 Locate Roller Assemblies Before attaching to top of doors assemble the units as shown above Attach two Roller Assemblies onto door with 4 1 1 4 Screws per Assembly center on the door f...

Page 29: ...r Door Tracks and Door Stops Center Door Track side to side and resting on Long Floor Runners Bottom of Door Stops and Door Tracks should be flush with each other Secure Door Tracks to shed with 9 3 s...

Page 30: ...ill attachments IMPORTANT Slide door back and forth to confirm door slides freely prior to attaching Top Track Overlay Track Brackets are slotted so door position can be adjusted horizontally as well...

Page 31: ...rack Check level before securing with 6 4 Screws Edge of overlay has been pre drilled for screws 61 Locate Top Track Overlay Front 3 4 x 5 1 2 x 87 3 4 Position front overlay underneath sill Attach wi...

Page 32: ...cia and then attach the front with 6 1 1 2 Finishing Nails Attach side with 5 1 1 2 Finishing Nails securing them into the nailing strip closer to the top of the side facia board Attach next piece of...

Page 33: ...1 1 2 Finishing Nails per piece 65 Locate Front Middle Trim Place trim piece over gap between front Wall Extendors Trim iece fits above Track Overlay Sill and below Roof Plywood Secure with 4 1 1 2 Fi...

Page 34: ...1 4 Screws Caulk gap between siding and window at top This requires a large amount of caulking but is important to fill Later Window Trims will be installed to hide caulking 68 Position Window Trim a...

Page 35: ...ng 3 Motor Freight Delivery 4 Quality of Materials 5 Assembly Manual 6 Overall Satisfaction The materials contained in this Assembly Manual may be downloaded or copied provided that ALL copies retain...

Reviews: