61.
Locate one
4R -
Side Facia
and one
4S -
Front Facia
and
align in front corner. Position facias underneath roof panel, doing
a dry run first before securing. Front Facia goes against rafter
ends and Side Facia goes against Facia Nailing Strip. Align so
the Front Facia caps the Side Facia. Attach Front Facia with
2 -
1 1/2” Finishing Nails
per rafter end. Attach Side Facia to
the Facia Nailing Strip with
5 - 1 1/2” Finishing Nails
.
Parts (Steps 60 - 65)
4R - Side Facia
- Angle Cut Ends
(1/2” x 5 1/2” x 54 1/8”)
x 2
4S - Front & Rear Facia - L/R
(1/2” x 5 1/2” x 50 1/2”)
x 4
4T - Front & Rear Facia - Center
(1/2” x 5 1/2” x 45 1/2”)
x 2
Hardware (Steps 61 - 64)
N1 - 1 1/2” Finishing Nails
x 46 total
60.
Attach
4Q -
Front Middle Trims
above doors
where front wall extenders come together above
track. Attach with
3 - 1 1/2” Finishing Nails
per
piece, aligning tight underneath soffit and centered
on seam.
Parts
4Q - Front Middle Trim
(1/2” x 2 1/2” x 7 1/2”)
x 2
Hardware
N1 - 1 1/2” Finishing Nails
x 6 total
Front Facia
caps Side Facia
Facia Nailing Strip
Side Facia
- Angle Cut
Front
Facia
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 38