6”
5”
6”
21.
Place and attach M Shingle (6” wide) directly on top of Shingle L. Shingle M will slide under 2nd
row Shingle. Secure with 2 - 7/8” Shingle nails 8” from Butt.
22.
Place and attach second L Shingle (5” wide) in line with 2nd row of shingles. Shingle L will
partially cover Shingle M. Secure with 2 - 7/8” Shingle nails 8” from Butt.
23.
Place and attach second M Shingle (6” wide) in line with 3rd row of shingles. Shingle M will partially cover
Shingle L. Secure with 2 - 7/8” Shingle nails 8” from Butt. Complete attachment of 3rd 5” wide L Shingle.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 11
6” Wide Shingle (M)
Slide under
1/4” gap
Nail
8”
from
Butt
Nailing
Line
Flush with L Shingle
2nd Row of Shingles
8”
from
Butt
1/4” gap
2nd L Shingle
2nd 6” wide
M Shingle
Thin end
Thick end
5”
3rd 5” wide
L Shingle
2nd 6” wide
M Shingle
3rd 5” wide
L Shingle