41.
To cover roof seam, slide one
Filler Shingle
(5 1/2” wide) up and underneath second shingle
row. Push or bang filler carefully with a hammer
until evenly spaced and butt is even with other 1st
row of shingles.
43.
Slide 2nd
Filler Shingle
up and underneath fourth shingle row. Follow
Steps 41 - 42
to align and
attach.
42.
Screw first filler shingle down to rafters using
1 - 2 1/2” Screw
per panel (2 in total). Screw on
slight angle and make sure to screw into rafter. Screw slightly above 3rd row of shingles (exposure
line).This way, the screw will get covered up when you install your 2nd Filler Shingle and will prevent
leaking.
Tip
Butt - thicker.
1st Shingle Row
2nd Shingle Row
Attach above
the exposure
line.
Exposure Line.
3rd Shingle Row
2nd Filler
Shingle.
4th Shingle Row
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 22