52.
Locate 3
Metal Roof Panels
and 3
Metal Roof Hangers
. To tem-
porarily hold the
Metal Roof Panels
in place, hook a
Metal Roof Hanger
onto the lowest
Batten
, approximatley where the center of the panels will
be. Place first
Metal Roof Panel
on Battens and into Hanger. Do not fas-
ten panels down until
Step 57
. Place remaining 2 panels and hangers on
the same way.
Metal Roof Panels
will overlap eachother.
Parts (Step 52)
Metal Roof Panels
(39” wide x 61” long)
x 3
Hardware (Step 52)
Y38 - Metal Roof Hangers
x 3
Important:
Do not fasten down Metal Roof Panels with
Hangers still in place. Metal Roof Hangers will temporarily help
keep Metal Roof Panels in place before they are fastened.
51.
To complete opposite side of roof repeat
Steps 46 - 50
.
Hardware (Step 51)
S2
- 1 1/4” Screws
x 36 total
Parts (Step 46)
Roof Battens
(3/4” x 3 1/2” x 48 1/4”)
x 8
Batten Spacers
(3/4” x 1 1/2” x 14”)
x 6
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 25