35.
Attach end of a 45 1/2” long
Soffit
Board flush to ends of outside
Rafter
with
2 - 1 1/4”
screws per Rafter end.
Drill pilot hole in Soffit
ends to prevent splitting.
Attach
Ridge Board
to opposite rafter end
with
2 - 2” screws,
while
aligning to bottom of rafter . Center
Soffit
on
Doubled-up Rafters and secure with
2 - 2” screws
. Measure 45 1/2” from
outside rafter and secure Ridge Board to rafter with
2 - 2” screws
. Attach
Doubled-up Rafters together with
3 - 2 1/2” screws
.
Ridge Board
34.
Locate 6
Rafters,
2
Soffits
and
completed
Ridge Board
from
Step 33.
Lay out as illustrated on a flat level sur-
face.
Ridge Board
4 1/2” wide
Soffits
56 1/2” Rafters
20 1/2”
23 1/2”
20 1/2”
91”
Centered on
Rafter
45 1/2”
Attach Doubled-up Rafters
with 2 1/2” screws
Sof
fit
45 1/2”
36.
Measure, position and attach mid rafters as illustrated above as per
Step 35.
mid rafter
Important:
Pilot Hole Ridge
Board & Soffits to prevent
splitting!
Parts (Step 34 - 42)
Rafters
(1 1/2” x 3 1/2” x 56 1/2”)
x 12
Soffits
(1/2” x 4 1/2” x 45 1/2”)
x 4
Hardware (Step 34 - 42)
S1 - 2 1/2” Screws
x 6
total
S2 - 1 1/4” Screws
x 48
total
S3
- 2” Screws
x 24 total
Important:
Ridge
Board must be aligned
as illustrated.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 19