Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 15
32.
. After completion of Rear Wall Extendors, complete the front wall Extendors following
Steps 30-31
.
33.
Locate Gable 1/2 Walls for both sides of
the shed. Align framing and wall siding lapp
together. Screw center wall framing of each
piece together with 3 - 2 1/2” screws.
Note:
prior to attaching, try each combination
of Gables for best fit.
Notched at top
Flashing
Flashing
Male / Female
Lapp Siding
31.
. Locate and place the
Middle Wall Extendor
on Top Plate and flush with Angled Extendor Wall
framing. When correctly in place, secure with 4 - 2 1/2” screws. Complete remaining Angled Wall Extendor
attachment.
Use 4 - 2 1/2” screws to connect Middle Wall to Angled Extendor Walls. See
Step 32.