
4430 Planer
OLIVERMACHINERY.NET
41
|
Page
Adjust Belt Tension
CAUTION:
Belt and pulleys may be hot
after operations. Allow components to cool
before servicing.
IMPORTANT:
After initial break-in period. The V-
belt should stretch by some amount. Check and
adjust belt tension after 16 hours of operation.
1.
Disconnect planer from power source!!
2.
Remove the belt cover knobs and the belt
cover.
3.
Apply moderate pressure on the V-belt
midway between the two pulleys. Properly
tensioned V-belt should deflect by
approximately 1/4“.
If belt tension needs adjustment:
4.
Remove the side panels to gain access to the
motor mount cap screws.
5.
Loosen the cap screws and lower the motor
to tighten the belt. If the belt becomes too
tight, raise the motor.
6.
Re-tighten the motor mount cap screws and
re-install the side panels when belt is
properly tensioned.
If belt needs to be replaced
7.
Loosen the belt and roll the belt off the
pulleys.
8.
Install new belts and make sure the belt sits
into the grooves of the pulleys.
9.
Adjust belt tension.
10.
Set a reminder to readjust belt tension after
the new belt is broken in. The process takes
approximately 16 hours of run time.
When belt maintenance completes
11.
Reinstall all the panels and covers.
12.
Remove all wrenches and tools before
restarting the planer.
Summary of Contents for 4430
Page 2: ......
Page 10: ...10 Page Oliver Machinery 4430 Planer Identification...
Page 11: ...4430 Planer OLIVERMACHINERY NET 11 Page...
Page 12: ...12 Page Oliver Machinery 4430 Planer...
Page 38: ...38 Page Oliver Machinery 4430 Planer Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6...
Page 50: ...50 Page Oliver Machinery 4430 Planer Wiring Diagram...
Page 51: ...4430 Planer OLIVERMACHINERY NET 51 Page Parts List Table Assembly...
Page 52: ...52 Page Oliver Machinery 4430 Planer Cabinet Assembly...
Page 53: ...4430 Planer OLIVERMACHINERY NET 53 Page Motor Mount Assembly...
Page 54: ...54 Page Oliver Machinery 4430 Planer Headstock Assembly...
Page 55: ...4430 Planer OLIVERMACHINERY NET 55 Page Gearbox Assembly Cover and Dust Hood Assembly...
Page 62: ...62 Page Oliver Machinery 4430 Planer Maintenance Record Date Task Operator...
Page 63: ...4430 Planer OLIVERMACHINERY NET 63 Page Notes...