
OligoMaker DNA/RNA Synthesizer
OligoMaker ApS
•
Kong Georgs Vej 12
•
DK-2000 Frederiksberg
•
Tel: +45 321 322 00
www.oligomaker.com
•
email:
p.28
12.3 Changing a valve
Changing a valve
To extract a valve, disconnect the electrical wire, and replace the valve with a new one.
When the new valve is in place, put on carefully the Alu-cover. Be sure not to get the
electrical cables jammed and pinched between the Alu-cover and the Peek-manifold.
Finally tighten the two screws. Place the Valve manifold in the
priming position
, and
check if the new valves are working well.
Operators are trained in the laboratory in Copenhagen. Ph.D. Karl Ross-Petersen or
M.Sc. Jakob Ross-Petersen will conduct the chemistry education. Ing. Quang Han will
conduct the electronic issues. Ing. Quang Han conducts questions related to the
mechanics.
The reagent bottles must be opened under a ventilated hood or similar. Power must be
switched off, while the instrument is opened during service.