16
10.
Commissioning
10.1
Setting of DIP-Switches
Prior to commissioning of Softening Control the correct installation and connections to the
softening system must be checked again. This includes the softener system should be operat-
ing and adequate soft water quality should be available at the outlet.
Then, basically, it is to decide if the device
monitors time or process controlled. Accord-
ing this decision a connection of contact wa-
ter meter and setting of DIP switch 4 is to
realize.
The threshold value to be monitored is to set
up with the DIP-switches 1-3.
The following process parameters are relevant and have to be set as parameters manually us-
ing the DIP-switches:
Process parameter
Value range
DIP-switches
Threshold value
for soft water hardness in %
in reference to raw water hardness
0.25 % to 10 %
1 , 2 , 3
Measuring interval
Time distance
between 2 measurements
time controlled
or
process controlled
4
Current loop resolution
20 mA = 2%
or 10 %
5
DIP-Switches