Launch by OFS | 4
LAUNCH
STEP 1 - BEAM ASSEMBLY
Note: Skip this step if assembling models
LA-10850CT or LA-13552CT.
1. Place beams veneer side down on soft surface (to prevent
scratching).
2. Beams should be end to end, bored ends to the outside, with
no gap between the beems.
3. Align grooves on the beams and slide the J-channel until it is
centered on the two beams.
4. Screw J-channel to beams using twenty-four (24) pan head
#10x7/8" screws (HK-58) on each J-channel.
STEP 2 - BASE PLACEMENT
1. Place bases in desired location. If assembling a table with
Power/Data option, base should be placed over Power/Data
outlets.
2. Place beams inside of opening so there is no gap between the
beam and the mending plate on the base. The J-channel edge
of the beam should be towards the floor.
3. Using a 3/16" drill bit, pre-drill holes for the lag bolts
(HK-106) through the beam into the base.
4. Drive lag bolts through the beams into the base and tighten
securely.
5. Level the base beam assembly at this time. Level should only
be placed on mending plates while leveling since a “crown” is
built into the beams.