
Issue2
November 14, 2011
- 13 -
Pad Installation Procedures
Have the following equipment ready before beginning this procedure:
1.
One masonry drill
2.
One 5/8” (15.9 mm) masonry drill bit
3.
Masonry expansion anchors
4.
One 9/16” wrench
5.
A pencil
6.
One Hammer
Use the procedure below to mount the cabinet on an existing concrete slab.
1.
Position the provided template on the slab in the desired location for the
cabinet and mark the location of the mounting holes with respect to the cable
entry area.
2.
Place the template out of the way.
3.
Drill 5/8” (15.9 mm) diameter by 3” (7.62 cm) deep holes at the locations
marked in step 2.
4.
Insert anchor bolts into the holes in the slab and tap them firmly into the holes
with a hammer.
5.
Remove the nuts and washers from the expansion anchors.
6.
Remove the rear panels and seals from the cable entry area of the cabinet.
7.
Remove the mounting bolt access covers from the plinth.
8.
Place the cabinet over the studs and reinstall nuts and washers. Secure the
cabinet to the slab by securely tightening all anchor bolts to 40 ft-lbs or as
recommended by the expansion anchor manufacturer.
9.
Reinstall the mounting bolt access covers on the plinth.
10.
Remove portion of the cable entry seals corresponding to the diameters of the
cables. Install the split cable seals around the cables and slide them down the
cables to the base of the cabinet.
11.
Reinstall the cable entry panels.