2.
Mounting PK 550
40 PK 550-18 to PK 550-25: Package FA16 to FA24
Assembling the cable channels
Package FA16
Package FA16 to FA24
`
Place the cable channels so that their bevelled end is to the front.
`
Fasten with 2 screws H8 x 16 + L8 washers in the third hole starting from the front and opposite the special nut.
`
Fasten them to the intermediate piece and the rear crosspieces with 2 screws H8 x 16 and L8 washers.
`
Align the 2 additional cable channels with the two others.
`
Fasten them to the intermediate piece and the rear crosspieces with 4 screws (H8 x 16) and L8 washers.
41 package MS1 or MS2
Assembling the casing positioning brackets
`
Fasten the positioning brackets (package MS1 or MS2) onto the right and left-hand upper bosses of the front section with: 2 screws H8
x 16 + 2 serrated washers (13 mm spanner).
A
M000103
1
2
Number of sections
18
19
20
21
22
23
24
25
Length (mm) - A
2510
2600
2800
2910
3000
3110
3200
3310