37
18/03/2016 - 300020196-02
PK 550
2.
Mounting PK 550
36 PK 550-9 to PK 550-17: Package FA31 to FA36
Assembling the top insulating material
Front
`
Put in place the 600 mm wide (packages FA31 to FA36) top insulating material on the body of the boiler.
37 PK 550-9 to PK 550-17: Package FA17 to FA27
Assembling the cable channels
Rear
`
Place the cable channels so that their bevelled end is to the front.
`
Fasten with 2 screws H8 x 16 + L8 washers in the third hole starting from the front and opposite the special nut.
`
Fasten at the rear with 2 screws H8 x 16 + L8 washers opposite the oblong holes and special nut.
M000099
80
90
1
Number of sections
9
10
11, 12
13, 14
15, 16
17
Length (mm)
1300
1500
1600
1800
2100
2200
0
0
M0
010
AVANT
1