31
Continued on Next Page
8.
Install Cover Sub Assembly onto the Ring Gear (18).
9.
Install Bolts (12) through Cover into Ring Gear (18) and torque them to 35-45 ft-lbs.
10.
Install Pipe Plugs (14) with thread sealant into Cover.
11.
The unit should now be leak and roll checked as per instructions on page 5 and 6. The
motor can be reinstalled into the gearbox for the leak check to seal it off, and the unit
pressurized through a pipe plug hole on the cover.
This concludes the Main assembly.
Summary of Contents for Fairfield Torque-Hub S40B Series
Page 1: ...1 Torque Hub Planetary Final Drive S40B Series Service Manual Rev 09 03 13 ...
Page 10: ...10 DISASSEMBLY ...
Page 11: ...11 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 20: ...20 ASSEMBLY ...
Page 29: ...29 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 32: ...32 Planetary Final Drive Service Manual Assembly Drawing ...
Page 36: ...36 T125034 BEARING CUP ASSEMBLY ADAPTOR ...
Page 37: ...37 T164786 ALIGNMENT PIN FOR ASSEMBLY ...
Page 38: ...38 T136699 750 DRIVE LOCKNUT WRENCH ...
Page 39: ...39 T163327 SPLINED LOCATOR RING ...
Page 40: ...40 T159309 LOADING PLUG AND BASE FOR ASSEMBLY ...
Page 41: ...41 T160835 ASSEMBLY PRESSING TOOL ...
Page 42: ...42 T158152 LOADING PLUG AND BASE FOR ASSEMBLY ...
Page 43: ...43 T158338 ASSEMBLY PRESSING TOOL ...
Page 44: ...44 T147871 N 12 LOCK NUT WRENCH ...
Page 45: ...45 T173814 LEAK TEST ADAPTOR ...
Page 46: ...46 T212150 ROLL TEST TOOL ...