TECHNICAL MANUAL. START-UP AND OPERATION
8 ESSENTIAL POINTS.
(Read carefully before start-up)
1.
Check unit condition upon receipt. If the unit is damaged or if the shipment is not complete, make a note in the delivery
note and send an immediate complaint to the company that forwarded the shipment.
2.
It is essential that the installer receives the installation manual. Read the manual and follow the safety, use and handling
instructions of the product carefully. Keep the manual for further reference.
3.
When washing the purification filter, the heat pump must be off. In the event of any maintenance or repair manipulation in the
heat pump, it is obligatory to switch off the power supply. You should not try any kind of repair work in the heat pump. A
qualified installer should be called. He will take it upon himself to return the faulty unit to the manufacturer. In order to
guarantee the correct operation of the pump it is necessary to make a periodic maintenance of the pump, to make a
good use of the pump and not to exceed the limits set by the manufacturer.
4.
The installation must be made by qualified technical personnel. These personnel commit themselves to observe the
instructions of the manufacturer and the applicable regulations. They also must have available standard issue material and
must guarantee their training in refrigeration facilities. The manufacturer should not be responsible for any damage in
the installation that may cause damages to animals, objects or people. The manufacturer should not be responsible
either for any wrong manipulations by the installer.
5.
This heat pump should be used for the purposes it has been built for. Any other use which does not conform will be
considered dangerous. The safety in the operation of the heat pump could be compromised by the lack of observance
of the previous points. The damages caused by errors in the installation, use or due to the lack of observance of the
instructions or applicable regulations are excluded from any guarantee.
6.
In the case of sale to third parties, it is advisable to include this manual with the heat pump, in case the new client or
installer wishes to consult it.
7.
The machine can take of 2 to 3 days in warming up the water until the wished temperature depending on the initial
conditions.
8.
The machine must work with filter.
26
Summary of Contents for 55234
Page 2: ......
Page 11: ...11 ATTENTION POMPE Á CHALEUR PacECO français ...
Page 29: ...ATTENTION PacECO HEAT PUMP english 29 ...
Page 47: ...ATENCIÓN BOMBA DE CALOR PacECO español 47 ...
Page 65: ...deutsch ACHTUNG 65 ...
Page 83: ...ATTENZIONE POMPA DI CALORE PacECO italiano 83 ...
Page 101: ...OPGELET PacECO WARMTEPOMP nederlands 101 ...
Page 119: ...ATENÇÁO BOMBA DE CALOR PacECO portugués 119 ...