BA_GMLW OTE bis V3.4 SHORT_EN_20090408_V1
Page 6 of 25
The heat pump is to be commis-
sioned by OCHSNER factory cus-
tomer service engineers. The cor-
rect construction and function of
the heating system, the heat
source and the electrical installa-
tion is the be ensured by the in-
staller. Otherwise, no guarantee
or warranty claims will be recog-
nised.
The electrical heating rods and circulation
pumps carry a guarantee period of 12 months.
Parts subject to wear and tear such as protec-
tive anodes, filters, signal lamps etc. are ex-
cluded from guarantee and warranty claims.
Increased effort due to appliances that are in-
correctly located or mounted shall be invoiced
with the guarantee work.
Read this instruction manual care-
fully before you start commission-
ing the heat pump!
4 Installation
4.1 Delivery
The heat pump is delivered on a non-returnable
palette and pack in cling-film. The cladding is
supplied in the heat pump packaging.
ARA License Nr. 7910
Any transport damage must be im-
mediately reported upon delivery!
The complete cladding must only be fitted after
the heat pump has been entirely connected up.
Fig. 1: Casing
1.
Mount the left and right hand side panels to
the base frame using the Velcro fasteners.
2.
Mount the front panel on to the lugs on the
side panels.
3.
Slide the plastic cover into the slots provided
on the front panel and screw to the side
panels using the 2 screws provided.
4.
Position the top panel on the side panels,
slide it towards the plastic cover until it slots
home. Screw the top panel to the rear panel
using the 2 screws provided.
4
2
3
1