SECTION 3
DONNING PROCEDURE
The following are the donning steps for the stored configuration of the M-20.2 EEBD. These six steps must
be practiced numerous times until they become second nature.
To fit the neck strap, simply place the neck strap over the head and pull upward on the o-ring to shorten
the neck strap.
To fit the face shield, simply pull the face shield over the head and pull outward on the o-rings to tighten
the face shield around the neck.
In the unlikely event that moisture on the inside of the face shield distorts your vision, simply press or rub
the face shield against the face with your hand.
CAUTION: The flow of oxygen will begin automatically when the unit is removed from it’s
base. You should not expect to hear the flow of oxygen or see the breathing
bag inflate.
Page 6 of 16