8
CONDENSATE
For Models 2OACH1211, 2OACH1811, 2OACH24 and 2OACH36, a 5-gallon
polyethylene tank is provided to collect condensate. The tank is located in the
lower front section of the unit, and can be accessed though the condensate tank
door. When the high water level is reached, a cut-out switch will AUTOMATICALLY
cycle off the compressor/condenser fan.
TANK LEVEL ADJUSTMENT INSTRUCTIONS
An adjustment screw is provided to
vary the cut-off level of the tank full
switch. If less water is desired, turn the
adjusting screw clockwise
(CW).
Turning the screw clockwise (CW),
will make the tank easier to remove.
MAXIMUM WATER LEVEL
3” FROM TOP OF TANK
CAUTION
UNPLUG UNIT BEFORE REMOVING
TANK TO ADJUST THE SET SCREW
.
Summary of Contents for 2OACH Series
Page 26: ...24 PIPING SCHEMATIC...
Page 27: ...25 WIRING SCHEMATIC FOR 2OACH12 18 and 24...
Page 28: ...26 WIRING SCHEMATIC FOR 2OACH3612...
Page 29: ...27 WIRING SCHEMATIC FOR 2OACH6012 DISCHARGE TEMP SENSOR...
Page 30: ...THREE PHASE MONITOR 28...
Page 31: ...29 WIRING SCHEMATIC FOR 2OACH3632...
Page 32: ...30 WIRING SCHEMATIC FOR 2OACH3634...
Page 33: ...31 WIRING SCHEMATIC FOR 2OACH6032...