Ground Fault Requirements 

Electrical rules and regulations and vary from country to country and sometimes even within a 
country. A local electrician should be consulted to determine local ground fault requirements. 

Some countries require residual current devices (RCD) or residual current circuit breakers (RCCB).  
This is an electrical wiring device that disconnects a circuit whenever it detects that electrical 
current is not balanced between the phase (“hot” or “live”) conductor and the neutral conductor. 

In the United States and Canada, a residual current device is also known as a ground fault circuit 
interrupter (GFCI), ground fault interrupter (GFI) or an appliance leakage current interrupter (ALCI). 
In Australia they are sometimes known as "safety switches". 

If a RCD/GFI is required, the standard general-purpose model may not work with the Océ ProCut 
system. The vacuum generator and optional milling/router spindle each have a frequency converter 
that is used to control their variable speed drive motor.  A frequency converter has a higher than 
typical leakage current and may trip a standard GFI (E.g in many areas in Europe the standard RFI 
has a fusing current of 10 mA).  If local regulations require a GFI, it must have a fusing current > 30 
mA per converter.  

(Compatible GFI model - Hager CDH440C or similar).

 

In a 200V electrical configuration with the milling/router option there are two connections to power 
supply system and if an RFI is required, both connections should have an RFI that has a fusing 
current of > 30 mA. 

In a 400V electrical configuration with the milling/router option there is a single connection to the 
power supply system and if an RFI is required it should have an RFI that has a fusing current of > 
60 mA (30 mA for the vacuum generator and 30 mA for the milling spindle and cutter). 

Please consult a local electrician to determine ground fault protection requirements. 

Router Vacuum Cleaner / Dust Extraction: 

 

If the Router option was ordered, a shop vacuum cleaner is required to remove the router debris. 
Depending on the material being worked with, the dust generated may be toxic or potentially 
explosive. Seek expert advice about the correct filter system and explosion protection when 
choosing a dust extractor. Only use dust extractors with external air-cooling for industrial purposes. 

In Europe, a router vacuum cleaner can be purchased from Océ or purchased directly by the 
customer from another vendor.  In North America the router vacuum cleaner must be purchased 
directly by the customer from another vendor.   If the customer purchases a shop vacuum 
consuming more than 10 Amperes, a separate control via a relay box is required. Note: This is 
common for 1KW milling equipment. 

Technical Requirements for vacuum cleaner: 

 

Value 

Units 

Min. Flow volume

 

3800 
1000 

L/min 

Gal/min

 

Table 10:  Vacuum Cleaner Specifications 

 

 

 

Summary of Contents for ProCut 1600 M

Page 1: ...Oc ProCut 1600 2500 and 3200 Series Cutters Revision E July 23 2010...

Page 2: ...Oc ProCut Site Prep Oc ProCut Site Preparation Guide Revision E ii Oc Display Graphics Systems 2010 All Rights Reserved Part Number 3010108370...

Page 3: ...Floor Loading 5 Electrical Placement 5 Location Dimensions 5 Electrical Requirements 6 400V Electrical connection 6 200V Electrical connection 7 Ground Fault Requirements 8 Router Vacuum Cleaner 9 Du...

Page 4: ...rical Connections with 2 2 2 55kW Vacuum Pumps 8 Table 9 Electrical Connections with 2 2 2 55kW Vacuum Pumps 8 Table 10 Vacuum Cleaner Specifications 9 Table 11 Compressed Air 10 Table 12 1600 Series...

Page 5: ...vision Summary Oct 27 2008 Revision A Initial release Dec 15 2008 Revision B Added harmonics and flicker info Mar 12 2009 Revision C Added 1600 series and 3200 XXL and XXXL models Jul 29 2009 Revision...

Page 6: ...the cutter to the installation location If necessary arrange for a forklift or mobile crane to be available on the installation day Examine the route to the desired location of the Cutter The followin...

Page 7: ...shipping crates Important The majority of the installation will be carried out by a Oc trained Service Technician However additional support is required for some tasks transportation moving heavy part...

Page 8: ...mensions mm In Crate kg Crate 1 Basic unit 3550 x 1580 x 700 720 Crate 2 Basic unit 3160 x 1580 x 940 1030 Largest part unpackaged 3412 x 300 x 300 115 2500 M Crate Dimensions mm In Crate kg Crate 1 B...

Page 9: ...with a vacuum cleaner will ship with the workstation inside a crate Cutter Extension Option Crate Dimensions and Weight Cutter Extension CE2500 Crate Dimensions mm Weight kg 2500 L 2690 x 890 x 560 19...

Page 10: ...face is recommended The difference in height over the entire installation surface must be less than 2 cm The subsurface for the machine must be sufficiently level and stable The floor in the operation...

Page 11: ...s used it must be a meet particular specifications see Ground Fault Requirements for more details Electrical connection 400 V system with 1 9kW Vacuum Generator The cutter is connected with one power...

Page 12: ...y voltage variance max 10 Power consumption 3 phases max 12 6kW typical 5 6kW Table 6 Power Consumption and Variance Figure 3 200V Electrical Connection A Cutter Power box Value Unit Phases 3 Voltage...

Page 13: ...L1 L2 L3 N PE CEE Plug 32A Table 8 Electrical Connections with 2 2 2 55kW Vacuum Pumps Electrical connections 208 V system with 2 2 2 55 kW vacuum pump 1600 M Only Comply with national instructions an...

Page 14: ...r CDH440C or similar In a 200V electrical configuration with the milling router option there are two connections to power supply system and if an RFI is required both connections should have an RFI th...

Page 15: ...lass ISO 8573 1 4 Pressure Air flow Air pressure 0 8 1 0 mPa 116 145 Psi Air flow minimum 300 L min 79 Gal min Basic unit 0 6 1 0 mPa 87 145 Psi 19 L min 5 Gal min Pneumatic Oscillating Tool 0 8 1 0 m...

Page 16: ...and knowledge of PC operation Only specially trained personnel must operate the Cutter Trainees must have prior knowledge of computers and basic mechanical abilities Trainees must be available during...

Page 17: ...s mm Weight kg Basic unit L x B 2512 x 2055 670 Operator console B1 300 Work Station B2 624 Router Option B3 330 1600 XL Dimensions mm Weight kg Basic unit L x B 2512 x 2995 890 Operator console B1 30...

Page 18: ...rator console B1 300 Work Station B2 624 60 Router Option B3 330 2500 M Dimensions mm Weight kg Basic unit L x B 3412 x 2055 840 Operator console B1 300 Work Station B2 624 60 2500 L Dimensions mm Wei...

Page 19: ...x 2995 1280 Operator console B1 300 Work Station B2 624 60 3200 XXL Dimensions mm Weight kg Basic unit L x B 4112 x 3465 1420 Operator console B1 300 Work Station B2 624 60 3200 XXXL Dimensions mm Wei...

Page 20: ...1519 105 Cutter Extension CE3200 T1 mm T2 mm Weight kg 3200 L 3145 1989 170 3200 XL 3145 2459 180 3200 2XL 3145 2929 230 3200 3XL 3145 3399 260 Table 15 Cutter Extension Dimensions and Weights Floor C...

Page 21: ...ms Safety Information Ear and eye protection required Minimum PC Requirements Please check the www dgs oce com web site for the latest PC specifications Oc ProCut Macintosh Prepress Client Intel MAC G...

Page 22: ...bit Color Minimum 2x available USB Ports for ONYX and Oc ProCut Server security keys dongles DVD ROM Drive TCP IP network connection 100Mbit or faster Windows Vista or Windows XP Pro with the latest s...

Page 23: ...rarily then a suitable place is available The size and weight of the machine have been taken into account and the floor is suitable for the cutter The power main connection is ready The power main sup...

Reviews: