Océ |   System Requirements

2-8 

3010102253-B

Current:......................8 AMPS maximum steady state
Power: .......................6kW max.
Circuit Breaker...........15 Amps

190 Volts @ 50 Hz

Voltage:......................190 VAC +/-10%, 3 Phase
Current:......................16.5 AMPS maximum steady state
Power: .......................7kW max.
Circuit Breaker...........20 Amps

380 Volts @ 50 Hz

Voltage:......................380 VAC +/-10%, 3 Phase
Current:......................8 AMPS maximum steady state
Power: .......................7kW max.
Circuit Breaker...........15 Amps

ODGS recommends that the AC power outlet for the vacuum pump be located within 8 
feet of the power inlet on the pump. 

2.2.4

GFI Circuit Breakers

Due to the use of electromagnetic interference (EMI) filters required to meet conducted 
radio frequency emission standards, the system is not compatible with ground fault 
interrupting (GFI) circuit breakers. Use standard thermal circuit breakers where possible.

1

 

Important:

Unplugging the power cord from the wall socket is the only way to 
isolate the entire machine.

Caution:
THE SOCKET OUTLET MUST BE INSTALLED NEAR THE EQUIPMENT 
AND BE EASILY ACCESSIBLE.
ATTENTION: LE SOCLE DE PRISE DE COURANT DOIT ÊTRE 
INSTALLÉ A PROXIMITÉ DU MATÉRIEL ET DOIT ÊTRE AISÉMENT 
ACCESSIBLE.
VORSICHT: DIE STECKDOSE SOLLTE NAHE AN DER MASCHINE 
UND BEGUEM ZUGÄNGLECH SEIN.

1. If standard thermal circuit breakers are used (standard in private homes and most office 

environments, there is a potential for nuisance tripping of the breaker due to inrush currents 
during equipment start-up. If this becomes a problem, we recommend the use of a breaker with 
higher inrush current capabilities or a circuit breaker designed for thermal-magnetic operation.

Summary of Contents for Arizona T220UV

Page 1: ...Oc Arizona T220UV Site Preparation Guide Revision B January 2005...

Page 2: ...Oc Display Graphics Systems 2004 All Rights Reserved...

Page 3: ...ements 5 Electrical Requirements 6 AC Power 6 Printer Power Requirements 6 Vacuum Pump Power Requirements 7 GFI Circuit Breakers 8 AC Distribution Circuit 8 Grounding 9 Compressed Air Requirement 9 En...

Page 4: ...i 3010102253 B List of Figures Arizona T220UV Printer 1 Arizona T220UV Table Crate Dimensions 3 Arizona T220UV Gantry Crate Dimensions 4 Maximum Room Size Requirements 5 Electrical Wiring Configuratio...

Page 5: ...upport Documentation and Service For further information on documentation and support for your Arizona T220UV or for information on other Oc Display Graphics Systems products please contact Web http w...

Page 6: ...telephone number Nature of the problem If we are unable to resolve your problem over the telephone field engineers can be dispatched to your site to conduct repairs Service visits are paid for by the...

Page 7: ...g 501 Richmond British Columbia Canada V6V 2C3 Contact Colin Soutar Email colin soutar dgs oceusa com http www cymbolic com http www oceusa com http www dgs oce com 604 232 2345 Direct Dial 604 273 77...

Page 8: ...Oc vi 3010102253 B Oc UK Ltd Langston Road Loughton Essex IG10 3SL United Kingdom Telephone 44 870 600 5544 Fax 44 870 600 1113 E mail salesinformation oce co uk Web site www oce co uk...

Page 9: ...rs as the gantry moves from one end of the table to the other The printer uses UV curable inks A set of ultraviolet lamps attached to the gantry provides curing of the UV ink on the media The Arizona...

Page 10: ...cts not visible from 3 feet fisheyes orange peel 1 2 4Oc ColorBlend Six Color Printing Oc ColorBlend technology uses the printer s fifth and sixth ink stations to provide the appearance of continuous...

Page 11: ...rvice engineer Crate 1 with the dimensions shown in Figure 1 contains the table assembly The loaded crates weighs approximately 916 kg 2022 lb The table assembly rests on its 6 castors within the crat...

Page 12: ...crates weighs approximately 544 kg 1200 lb The gantry must not be removed from its crate until it is to be installed on the table The crate was specifically designed to be a tool for installing the ga...

Page 13: ...The table without gantry will pass through a 6 1 8 meter doorway 2 1 3Space Requirements The Arizona T220UV must be installed in an area large enough to allow for normal operation of the printer load...

Page 14: ...semblies Both the printer and vacuum pump come equipped with panel mount inlet connectors Mating connectors are provided connector is shown in Figure 5 The printer and pump have the same electrical wi...

Page 15: ...3AMPS maximum steady state Power 15kW max Circuit Breaker 30 Amps1 It is recommended that the AC power outlet for the printer be located within 8 feet of the power inlet on the printer 2 2 3Vacuum Pum...

Page 16: ...ound fault interrupting GFI circuit breakers Use standard thermal circuit breakers where possible 1 Important Unplugging the power cord from the wall socket is the only way to isolate the entire machi...

Page 17: ...e supply conductors The ground conductor is connected to the equipment grounding bus in the main service panel or in a separately derived system such as a constant voltage transformer if one is to be...

Page 18: ...ters sanders or trimmers are used The printer should not be installed near equipment that produces strong radio frequency interference The recommended environmental conditions for temperature and humi...

Page 19: ...lled on a stiff well supported floor a concrete floor is ideal to minimize transmission of vibration and shock to the machine from other equipment A poorly supported floor may transmit shock loads to...

Page 20: ...rotective equipment needs must be evaluated based on information provided on the MSDS sheet and the special circumstances created by the spill including the material spilled the quantity of the spill...

Page 21: ...meter to create ICC profiles with Onyx PosterShop s Media Manager software The Gretag spectrophotometer is recommended but any model verified by Onyx to work with your version of PosterShop is accepta...

Page 22: ...For PosterShop Data LVD SCSI 68pin Adaptec 29160 Host Adapter card installed 100 Base T network interface card One USB port required for Security Key DVD ROM drive suggested 40x CD ROM minimum require...

Page 23: ...and send the completed checklist to us at least three weeks before the scheduled installation date This will allow us enough time to help you correct any possible deficiencies and help us plan the in...

Page 24: ..._____________________________ The customer agrees to have an operator available for the installation This will allow the customer to get into production as quickly as possible Company Date Contact Dis...

Page 25: ...ts Printer Page 2 6 Requirements met Electrical Requirements Vacuum Requirements met Environmental Requirements Page 2 9 Requirements met Air Requirements Page 2 9 Requirements met Customer Equipment...

Page 26: ...Oc Pre Installation Checklist 18 3010102253 B...

Reviews: