![Oce Arizona T220UV Site Preparation Manual Download Page 25](http://html2.mh-extra.com/html/oce/arizona-t220uv/arizona-t220uv_site-preparation-manual_3277694025.webp)
|
5/25/05
-17-
A.2
System Requirements Checklist
Requirement
Y
N
Space and Location Requirements:
Page 2-5
Clear path from loading dock to operating site
Minimum Room Dimensions: 5.5m (18’) ×7.35m (24.1’)
Electrical Requirements (Printer):
Page 2-6
Requirements met
Electrical Requirements (Vacuum)
Requirements met
Environmental Requirements:
Page 2-9
Requirements met
Air Requirements:
Page 2-9
Requirements met
Customer Equipment Requirements:
Page 2-12
Densitometer, Spectrophotometer
(If customer requires custom profile medias)
PosterShop
®
Computer with minimum or greater hardware and software
components
Onyx PosterShop
®
Training for operator(s)