27
Phase 1 adjustment
Turn the adjusting toggle 90° clockwise.
The track adapter is now connected to
phase 1.
Phase 2 adjustment
(3-phase track adapter only)
Turn the adjusting toggle 90°
anticlockwise.
The track adapter is now connected to
phase 2.
Phase 3 adjustment
(3-phase track adapter only)
Pull out the adjusting toggle.
Turn it 90° anticlockwise.
The track adapter is now connected to
phase 3.
Push the cover back on so it is flush (it
is held in place by clips).
Remove the protective film from the
housing.
The body is now fully assembled.
To assemble the head: See "Assembling
the head".
Swivel the housing 90° to the left or
right as required.
Orientation: Parallel to the bus bar.
3 2
10
Sento faro track
Summary of Contents for Sento faro Series
Page 1: ...Sento body faro Montageanleitung Mounting instructions up track...
Page 2: ......
Page 3: ...De up flat track...
Page 4: ...2...
Page 8: ...6 S f S f S f...
Page 10: ...8 C O M b M 2 N...
Page 17: ...15 m n...
Page 18: ...16 H M O C b M...
Page 24: ...22 E 1 S 3 2 1 0 Installation...
Page 31: ...29 Anhang...
Page 34: ...32...
Page 35: ...En up flat track...
Page 36: ...2...
Page 40: ...6 S f S f S f...
Page 42: ...8 C O M B m 2 m...
Page 49: ...15 ng...
Page 50: ...16 H c M O C B m...
Page 56: ...22 E 1 b 3 2 1 0 Installation...
Page 63: ...29 Appendix ng w n ng...
Page 66: ...32...
Page 67: ......