10
Cut the mains cable to a length of 5 cm
and strip the insulation from the ends.
5 cm
230 V AC
mains cable
Sento LED faro up
Installation
Place the mounting plate over the
power outlet and against the ceiling,
and turn it until the elongated holes are
aligned as required. Mark the positions
where the holes are to be drilled.
Check the routing of the power
cables.
Drill two 6 mm diameter holes, push in
the rawlplugs so that they lie flush and
screw on the mounting plate (screws
and rawlplugs are included in the scope
of delivery).
Ensure that the screws finish flush with
the mounting plate.
Connected separately
Connected with through-wiring
Summary of Contents for Sento faro Series
Page 1: ...Sento body faro Montageanleitung Mounting instructions up track...
Page 2: ......
Page 3: ...De up flat track...
Page 4: ...2...
Page 8: ...6 S f S f S f...
Page 10: ...8 C O M b M 2 N...
Page 17: ...15 m n...
Page 18: ...16 H M O C b M...
Page 24: ...22 E 1 S 3 2 1 0 Installation...
Page 31: ...29 Anhang...
Page 34: ...32...
Page 35: ...En up flat track...
Page 36: ...2...
Page 40: ...6 S f S f S f...
Page 42: ...8 C O M B m 2 m...
Page 49: ...15 ng...
Page 50: ...16 H c M O C B m...
Page 56: ...22 E 1 b 3 2 1 0 Installation...
Page 63: ...29 Appendix ng w n ng...
Page 66: ...32...
Page 67: ......